The US Coast Guard is soliciting bids for the dredging of the entrance channel into the mooring basin of USCG Station Eaton’s Neck. The contractor will be responsible for providing all personnel, equipment, and materials necessary to perform the dredging work, which is estimated to be around 6,000 cubic yards of material. The work must be completed by 24 March 2026, and the contractor will be compensated for the actual quantity of material removed and disposed of. The estimated value of the procurement is between $500,000 and $1,000,000.
• The dredging work is restricted to mechanical methods.
• The contractor must conduct dredging operations so that navigation through the channel is possible at all times.
• The contractor will be required to provide a cost for dredging per cubic yard.
• The dredge disposal site location is at the USCG STA Eatons Neck Beach Site.
• A 20% bid guarantee is required, and performance and payment bonds will be required.
You found this one too late. Don't find the next one too late.
Bid Banana searches open government bids across all 50 states, updated daily. Save a search once and we email you your new matches, daily or weekly, while there is still time to win them.