Bid Banana
PricingBid helpAPILog inStart free trial
Log inStart free trial

Learn more

  • Ohio guideOhio Bids and Bidding Guide
  • Pricing your bidWhy Your RFP Pricing Strategy Is Costing You
  • How to answer an IFBInvitation for Bid: You Just Received an IFB, Now What?
More civil engineering bids →Must-win bid? Bring in The Bid Lab →
Bid Banana
SearchPricingBid helpBrowse bidsAPISupportFAQPrivacy PolicyTerms of UseAI Use Policy

This website and its content is copyright of The Bid Lab © 2026. The Bid Lab is a trademark of Bid Lab, LLC. All rights reserved.

  1. Bid Banana
  2. ›Closed bids
  3. ›Ohio
  4. ›Civil Engineering
  5. ›Riverside Drive Shared Use Path

City of Upper Arlington·Ohio

Riverside Drive Shared Use Path

Closes 5/27/2026$500k – $2MInvitation for Bid
Bid source

This opportunity has closed.

Bid Banana tracks 1.6M+ bids and awards across all 50 states. Save a search and we'll email your new matches, daily or weekly — so the next one reaches you with time to bid.

Get alerted next time

Description

The City of Upper Arlington is seeking bids for the construction of the Riverside Drive Shared Use Path. The project involves the creation of a shared use path, and the bidder must complete the work within 150 calendar days from the date specified in the Notice to Proceed. The prices for all items shall include the necessary labor, material, and equipment to complete the work as shown or specified. • The project requires the bidder to examine the contract form and specifications and be familiar with the liquidated damage features. • The bidder must agree to accomplish the specified work within 150 calendar days. • The prices for all items shall include the necessary labor, material, and equipment to complete the work as shown or specified. • The City of Upper Arlington reserves the right to reject any and all bids, to waive any and all informalities, and to disregard all non-conforming responsive or conditional bids.

Attached files

The solicitation documents live at the source — open the bid source above to download them.

Contact

Valerie Piccininni(Purchasing Administrator)

[email protected]

Key dates

Opened
5/13/2026
Questions due
5/22/2026
Pre-bid meeting
5/20/2026
Closes
5/27/2026
Duration
150 days

Last updated

Details

Type
Invitation for Bid
Industry
Civil Engineering
NAICS
237990
Solicitation №
UA26-38 Addendum 1

Budget estimate

$500,000 – $2,000,000

The budget for this project is not explicitly stated in the document. However, based on the scope of the project, which involves the construction of a shared use path, the budget could be in the range of $500,000 to $2,000,000. This estimate is based on the assumption that the project requires significant labor, material, and equipment costs. Factors that may influence the likely payment range include the length and complexity of the shared use path, the materials used, and the labor costs.

AI estimate from the solicitation

Similar opportunities

Matched by Bid Banana AI™

Bid Banana · 1.6M+ bids and awards 🍌

You found this one too late. Don't find the next one too late.

Bid Banana searches open government bids across all 50 states, updated daily. Save a search once and we email you your new matches, daily or weekly, while there is still time to win them.

1.6M+
bids & awards
All 50
states
4,000+
agencies
Start your 7-day free trial

Plans from $49.99/month. Cancel anytime, no setup fees.

Built by The Bid Lab, answering RFPs since 2017.

Maryland Town of Port Deposit·Maryland

Top match · 62%

RFQ: Susquehanna River Road Corridor Safety, Shared-Use Path and Quarry Park Access Improvements

Closes 11/16/2026Opened 10/16/2026

City of Kearney·Missouri

62% match

Mack Porter Park Connector Shared Use Path - Kearney, MO

Closes 11/3/2026Opened 10/6/2026

City of Charlotte·North Carolina

61% match

Harrisburg Road Shared Use Paths (SUPs)

Rolling / TBD closeOpened 2/23/2026

Missouri Department of Transportation·Missouri

61% match

KC District, City of Kearney, Mack Porter Park Connector Shared Use Path

Closes 11/3/2026Opened 10/7/2026

City of Brandon·Mississippi

60% match

GRANTS FERRY PARKWAY MULTI-USE PATH PHASE 2

Closes 11/13/2026Opened 10/13/2026

City of Charlotte·North Carolina

60% match

SouthPark Loop - Cameron Valley Parkway

Rolling / TBD closeOpened 1/1/2027

City of Cincinnati·Ohio

60% match

Little Miami Scenic Trail Shared Use Path PID 115291

Closes 11/18/2026Opened 10/28/2026

City of Hampton·Virginia

60% match

ITB 27-15/TM LITTLE BACK RIVER ROAD RECONSTRUCTION

Closes 11/3/2026Opened 9/30/2026

County of Riverside·California

59% match

Wayfinding Application Services

Closes 12/9/2026Opened 10/28/2026

City of Shawnee·Kansas

59% match

Ordinance No. 3518

Closes 3/4/2031Opened 3/4/2025

Ontonagon Valley Sportsmen's Club·Michigan

59% match

Ontonagon Valley Sportsmen's Club South Branch Ontonagon River Canoe Landing

Closes 12/18/2026Opened 9/26/2026

City of Cincinnati·Ohio

59% match

Little Miami Scenic Trail Shared Use Path PID 115291

Closes 11/18/2026Opened 10/28/2026

Virginia Department of Transportation·Virginia

58% match

A46_2027 SMART SCALE - SHARED USE PATH

Closes 11/18/2026Opened 10/14/2026

City of Riverside·California

58% match

Stover Avenue Sidewalk Improvements (Fury Drive to Eagle Rock Drive)

Closes 11/9/2026Opened 10/8/2026

Camden County·New Jersey

58% match

Newton Lake Park & Cooper River Park Path Improvements Project

Closes 11/18/2026Opened 9/10/2026

Illinois Natural Resources·Illinois

58% match

Recreational Corridor greenways and trails planning

Rolling / TBD closeOpened 7/1/2026

City of Flowood·Mississippi

58% match

Liberty Road to Manship Road Shared-Use Path Overlay STP-0291-00(010) LPA110134/701000

Closes 11/10/2026Opened 10/9/2026

City of Monterey·California

57% match

VETERANS PARK BIKE PATH, SEGMENT 4 PROJECT (NCP2435)

Closes 12/8/2026Opened 10/26/2026

Riverside Transit Agency·California

57% match

Paratransit and Microtransit Services

Closes 11/20/2026Opened 10/22/2026

Charleston County·South Carolina

57% match

Road Work - Riverland Drive (S-53) Pedestrian Improvements & Central Park Road (S-67) Roadway Improvements

Closes 12/1/2026Opened 10/30/2026

County of San Luis Obispo·California

57% match

Vineyard Drive Corridor East Enhancements

Closes 11/5/2026Opened 10/15/2026

City of Harrisonburg·Virginia

57% match

Northend Greenway (NEG) Brookside ITB (2027020-PW-B)

Closes 12/10/2026Opened 10/22/2026

Virginia Department of Transportation·Virginia

57% match

A53_2027 SMART SCALE - SHARED USE PATH

Closes 11/18/2026Opened 10/27/2026