Bid Banana
PricingBid helpAPILog inStart free trial
Log inStart free trial

Learn more

  • California guideCalifornia Bids and Bidding Guide
  • Compliance checkHow to Ensure RFP Compliance
  • How to answer an RFPChoosing and Responding to Government Bids
More renewable energy bids →Must-win bid? Bring in The Bid Lab →
Bid Banana
SearchPricingBid helpBrowse bidsAPISupportFAQPrivacy PolicyTerms of UseAI Use Policy

This website and its content is copyright of The Bid Lab © 2026. The Bid Lab is a trademark of Bid Lab, LLC. All rights reserved.

  1. Bid Banana
  2. ›Closed bids
  3. ›California
  4. ›Renewable Energy
  5. ›CSUB Solar & Battery Advanced Shovel-Ready SLPPA

California State University·California

CSUB Solar & Battery Advanced Shovel-Ready SLPPA

Closes 9/25/2026$6M – $12MRequest for Proposal
Bid source

This opportunity has closed.

Bid Banana tracks 1.6M+ bids and awards across all 50 states. Save a search and we'll email your new matches, daily or weekly — so the next one reaches you with time to bid.

Get alerted next time

Description

The California State University, Bakersfield is seeking a qualified commercial entity to design, finance, construct, own, operate, maintain, and eventually remove a 4.55 MW dc (3.5 MW ac) solar photovoltaic system paired with a 2.93 MW/11.75 MWh Tesla Megapack battery storage system on a 14.47‑acre campus site. The contractor must hold both CSLB Class A (General Engineering) and Class C‑10 (Electrical) licenses, demonstrate medium‑voltage experience, and integrate a SEL micro‑grid controller, Aderis SCADA, and Energy Toolbase EMS while meeting non‑export, behind‑the‑meter interconnection requirements with PG&E. The scope includes installation, commissioning, performance guarantees (7,675,565 kWh year‑1 production, 0.5 % annual degradation, ≥ 98 % BESS availability), provision of security fencing, fire‑access, and campus‑side load‑shedding coordination, and delivery of an all‑inclusive 20‑year PPA price that incorporates a 7 % CSU transaction fee and assumes a $5.745 M bundled advancement cost. The project must achieve Commercial Operation by December 1 2027, with liquidated damages of $3,500 per day for delays. • Install 4.55 MW dc solar PV (Trina modules) and three Tesla Megapack 2 XL units. • Provide SEL‑3530 micro‑grid controller, SEL protection relays, Aderis SCADA, Energy Toolbase EMS, and revenue‑grade metering. • Deliver all‑inclusive PPA pricing (single $/kWh rate, ≤ 2 % escalator) covering construction, financing, tax‑credit risk, and a 7 % transaction fee. • Meet licensing (CSLB Class A & C‑10), medium‑voltage, BESS‑control, and safety‑critical experience requirements; supply 100 % performance and payment bonds. • Complete construction, testing, and PTO by 1 Dec 2027; provide academic access, security fencing, and compliance with CEQA, fire, environmental, and campus safety regulations.

Attached files

Contact

Andrew Duncan(Contract Specialist, Procurement & Contracts Administration)

[email protected]

(661) 654-3182

Key dates

Opened
7/15/2026
Questions due
8/12/2026
Pre-bid meeting
8/5/2026Mandatory
Site visit
8/5/2026Mandatory
Closes
9/25/2026
Projected award
11/18/2026
Duration
20 years

Last updated

Details

Type
Request for Proposal
Industry
Renewable Energy
NAICS
237130
Solicitation №
CSUB-RFP-11108

Budget estimate

$6,000,000 – $12,000,000

The solicitation references a bundled project advancement and procurement cost of $5.745 M, plus a 7 % transaction fee on the construction‑cost base, and the contractor will receive an all‑inclusive PPA rate over 20 years. Assuming the construction‑cost base is roughly $5.3 M (the bundled cost less the transaction‑fee component), the 7 % fee adds about $371 k, yielding a total contract value near $6.1 M for design, construction, and commissioning. In addition, the long‑term PPA provides annual revenue based on the negotiated $/kWh rate (typically $0.07‑$0.12/kWh for solar‑plus‑storage), which over 20 years could generate $8‑$12 M in gross energy payments. Therefore the contractor’s earnings (construction + PPA revenue) are likely to fall between $6 M and $12 M over the contract life, with the construction portion representing the upfront budget and the remainder realized as ongoing energy payments.

AI estimate from the solicitation

Similar opportunities

Matched by Bid Banana AI™

Bid Banana · 1.6M+ bids and awards 🍌

You found this one too late. Don't find the next one too late.

Bid Banana searches open government bids across all 50 states, updated daily. Save a search once and we email you your new matches, daily or weekly, while there is still time to win them.

1.6M+
bids & awards
All 50
states
4,000+
agencies
Start your 7-day free trial

Plans from $49.99/month. Cancel anytime, no setup fees.

Built by The Bid Lab, answering RFPs since 2017.

New York State Energy Research and Development Authority·New York

Top match · 64%

Sun and Soil Program

Closes 12/10/2026Opened 9/16/2026

NYSERDA·New York

63% match

Sun and Soil Program

Closes 12/10/2026Opened 9/16/2026

National Aeronautics And Space Administration·Alabama

63% match

TECHNOLOGY TRANSFER OPPORTUNITY: Carbon Fiber Sleeve Tempers Battery Thermal Runaway (MSC-TOPS-119)

Closes 8/10/2027Opened 8/10/2026

State University of New York (SUNY)·New York

62% match

Snow Removal Services

Closes 11/18/2026Opened 10/27/2026

City and County of Butte-Silver Bow·Montana

62% match

Butte-Silver Bow Library Solar Project

Closes 11/10/2026Opened 10/22/2026

Town of Woodstock·Vermont

62% match

Sidewalk Shoveling Season 2026-2027

Closes 11/16/2026Opened 10/23/2026

National Aeronautics And Space Administration·United States of America

62% match

TECHNOLOGY TRANSFER OPPORTUNITY: Carbon Fiber Sleeve Tempers Battery Thermal Runaway (MSC-TOPS-119)

Closes 8/10/2027Opened 8/10/2026

Maryland Wicomico County Board of Education·Maryland

62% match

BENNETT MIDDLE SCHOOL SOLAR POWER SYSTEM PROJECT

Closes 11/12/2026Opened 10/13/2026

U.S. Department Of Energy·Idaho

62% match

Technology Licensing Opportunity: Electrochemical Recycling Technology for Sustainable Recovery of Tellerium and Cadmium from CdTE Photovoltaics

Closes 11/8/2026Opened 8/24/2026

New York State Energy Research and Development Authority·New York

62% match

Affordable Solar and Storage Predevelopment and Technical Assistance

Closes 12/31/2029Opened 12/19/2024

U.S. Advanced Research Projects Agency Energy·United States of America

61% match

SEEDING CRITICAL ADVANCES FOR LEADING ENERGY TECHNOLOGIES WITH UNTAPPED POTENTIAL (SCALEUP) READY

Closes 9/29/2029Opened 10/2/2024

Northeast Wisconsin Technical College·Wisconsin

61% match

Green Bay Campus Rooftop Solar

Closes 11/3/2026Opened 10/12/2026

U.S. Department Of Energy·Idaho

61% match

Technology Licensing Opportunity: Electrochemical Recycling Technology for Sustainable Recovery of Tellerium and Cadmium from CdTE Photovoltaics

Closes 11/8/2026Opened 9/8/2025

California Department of Transportation·California

61% match

Construct DPP infiltration areas, capture housing, bioswales, & MVPs.

Closes 11/10/2026Opened 9/28/2026

Power Authority of New York·New York

61% match

Power Vista Solar

Closes 11/9/2026Opened 8/26/2026

Connecticut City of Stamford·Connecticut

60% match

City Design Build RFP –Terry Conners Ice Rink Solar Photovoltaic (PV) & Battery

Closes 12/17/2026Opened 10/22/2026

City of Porterville·California

60% match

Emergency Call Boxes

Closes 11/6/2026Opened 10/16/2026

City of Pawtucket Department of Public Works·Rhode Island

60% match

Snow Plowing & Sanding Services - Continuous Recruitment

Closes 2/25/2027Opened 9/29/2026