Bid Banana
PricingBid helpAPILog inStart free trial
Log inStart free trial

Learn more

  • California guideCalifornia Bids and Bidding Guide
  • How to answer an RFIRFI Meaning: What Is an RFI?
More civil engineering bids →Must-win bid? Bring in The Bid Lab →
Bid Banana
SearchPricingBid helpBrowse bidsAPISupportFAQPrivacy PolicyTerms of UseAI Use Policy

This website and its content is copyright of The Bid Lab © 2026. The Bid Lab is a trademark of Bid Lab, LLC. All rights reserved.

  1. Bid Banana
  2. ›Closed bids
  3. ›California
  4. ›Civil Engineering
  5. ›Olivehurst Roadway Climate Resiliency Project

Yuba County·California

Olivehurst Roadway Climate Resiliency Project

Closes 10/8/2026$150k – $500kRequest for Information
Bid source

This opportunity has closed.

Bid Banana tracks 1.6M+ bids and awards across all 50 states. Save a search and we'll email your new matches, daily or weekly — so the next one reaches you with time to bid.

Get alerted next time

Description

The Olivehurst Roadway Climate Resiliency Project in Olivehurst, Yuba County, California aims to improve approximately five miles of residential streets by rehabilitating hot‑mix asphalt (HMA) pavements, installing storm‑drain systems, and adding multimodal facilities (sidewalks, curb‑and‑gutter, ADA ramps, bike lanes, striping, and traffic control devices). The geotechnical pavement evaluation report (Project No. S2749‑05‑01) provides detailed analysis of existing pavement conditions, subgrade soil characteristics, and recommends rehabilitation alternatives such as HMA overlay, full‑depth reclamation (FDR), or removal and replacement. Recommendations also include surface preservation treatments (slurry seal, microsurfacing, chip seal, cape seal) for streets in fair condition. The report outlines design traffic indexes (TI 5.0‑6.0), required design R‑values, and presents mix designs for FDR using lime and cement. • Approx. 25,960 ft (≈ 5 mi) of residential streets to be upgraded. • Existing pavement generally fair; some segments in poor condition requiring structural rehabilitation. • Recommended rehabilitation options: HMA overlay (5‑10 yr service life), FDR (≈ 20 yr), or full removal & replacement (longest life but costly). • Surface treatments (slurry seal, microsurfacing, chip seal, cape seal) viable for streets in fair condition (4‑7 yr life). • Subgrade soils primarily lean clay with varying plasticity; lime and cement stabilization recommended where needed. • Design traffic indexes set at 5.0‑6.0; design R‑values ranging from 5 to 30 depending on location.

Attached files

The solicitation documents live at the source — open the bid source above to download them.

Contact

Chris Brady(Senior Engineer)

[email protected]

(209) 505-1891

Key dates

Opened
8/26/2026
Questions due
9/28/2026
Closes
10/8/2026

Last updated

Details

Type
Request for Information
Industry
Civil Engineering
NAICS
237310
Solicitation №
102-2265.1

Budget estimate

$150,000 – $500,000

The consulting scope for a detailed geotechnical pavement evaluation, including field investigations, laboratory testing, mix‑design development, and a comprehensive final report, typically ranges from $150,000 to $500,000 for a project of this size (≈ 5 mi of streets, multiple soil and pavement tests, and design recommendations). Factors influencing the final fee include the number of core samples (25), extent of laboratory analyses, travel/logistics for site access, and the depth of design work (e.g., FDR mix design).

AI estimate from the solicitation

Similar opportunities

Matched by Bid Banana AI™

Bid Banana · 1.6M+ bids and awards 🍌

You found this one too late. Don't find the next one too late.

Bid Banana searches open government bids across all 50 states, updated daily. Save a search once and we email you your new matches, daily or weekly, while there is still time to win them.

1.6M+
bids & awards
All 50
states
4,000+
agencies
Start your 7-day free trial

Plans from $49.99/month. Cancel anytime, no setup fees.

Built by The Bid Lab, answering RFPs since 2017.

California Grants·California

Top match · 72%

Climate Adaptation and Resiliency

Rolling / TBD closeOpened 6/18/2025

California Grants·California

71% match

Baldwin Hills & Urban Watersheds Conservancy (BH UWC) Proposition 4: Community and Climate Resilience Grant Program

Rolling / TBD closeOpened 5/6/2026

Sterling Heights·Michigan

67% match

NORTH VAN DYKE AVENUE CORRIDOR IMPROVEMENTS & STORMWATER RESILIENCE PLANNING

Closes 11/10/2026Opened 9/30/2026

California Grants·California

67% match

Coachella Valley Mountains Conservancy Proposition 4 Nature Based Solutions and Climate Adaptation Grant Program

Rolling / TBD closeOpened 3/13/2026

City of Portsmouth·Virginia

66% match

IFB#77-27-YE HUMAN RESOURCE MANAGEMENT EMPLOYEE CLIMATE ACTION PLAN

Closes 11/23/2026Opened 10/27/2026

Agriculture & Markets, NYS Dept. of·New York

66% match

Climate Resilient Farming Program – Round 10

Closes 11/23/2026Opened 9/25/2026

Illinois Emergency Mgt Agency·Illinois

66% match

2023 Building Resilient Infrastructure and Communities (BRIC)

Rolling / TBD closeOpened 12/22/2025

Connecticut Energy & Environmental Protection·Connecticut

66% match

Energy Resilience Construction Grants

Closes 12/1/2026Opened 8/26/2026

California Grants·California

66% match

Watershed Resilience Conservation Implementation

Rolling / TBD closeOpened 8/4/2026

California Grants·California

66% match

Prop 4 – Wildfire and Forest Resilience

Rolling / TBD closeOpened 6/8/2026

Connecticut Energy & Environmental Protection·Connecticut

65% match

Energy Resilience Construction Grants

Closes 12/1/2026Opened 8/26/2026

Connecticut Energy & Environmental Protection·Connecticut

65% match

Energy Resilience Construction Grants

Closes 12/1/2026Opened 8/26/2026

MTA - NYC Transit (NYCT)·New York

65% match

Preliminary Engineering and Planning Services for Climate Resilience and Infrastructure Improvements on the Metro-North Railroad.

Closes 3/5/2027Opened 1/26/2026

U.S. Department Of Transportation·Washington

65% match

WA NP OLYM PMS(1), Pavement Preservation Olympic Phase 1; WA NP OLYM PMS(2), Pavement Preservation Olympic Phase 2; WA NP NOCA PMS(2), Pavement Preservation Stehekin; & WA FLAP JEFFER 91420(6), Upper Hoh Road Resurfacing

Closes 7/22/2028Opened 7/22/2026

Connecticut Energy & Environmental Protection·Connecticut

65% match

Energy Resilience Construction Grants

Closes 12/1/2026Opened 8/26/2026

U.S. DOC NOAA - ERA Production·United States of America

65% match

Climate Program Office FY 2027 - Super Intelligence/Machine Learning Innovation to Advance NOAA's Earth System Science and Support Hazard Resilience

Closes 2/9/2027Opened 10/27/2026

Massachusetts Executive Office of Energy and Environmental Affairs·Massachusetts

64% match

Municipal Vulnerability Preparedness Planning 2.0 Program Equity Partners RFR

Closes 11/6/2026Opened 10/1/2026

Connecticut Energy & Environmental Protection·Connecticut

64% match

Energy Resilience Construction Grants

Closes 12/1/2026Opened 8/26/2026

City of Pasadena·California

64% match

El Molino Avenue Demonstration Project

Closes 11/6/2026Opened 10/7/2026

New York City Department of Design and Construction·New York

64% match

CONSTRUCTION SERVICES FOR PROPOSED EAST SIDE COAST RESILIENCY PROJECT (ESCR)

Rolling / TBD closeOpened 6/7/2019

California Grants·California

64% match

Prop 4 – Randall Preserve

Rolling / TBD closeOpened 3/26/2026

California Grants·California

64% match

Proposition 4 – Wildfire and Forest Resilience

Rolling / TBD closeOpened 12/11/2025

U.S. Geological Survey·United States of America

64% match

Cooperative Agreement for affiliated Partner with the Colorado Plateau Cooperative Ecosystem Studies Unit

Closes 11/30/2026Opened 10/30/2026

City of Charlotte·North Carolina

64% match

Barrington Drive 5919 Storm Drainage Improvement Project

Rolling / TBD closeOpened 2/15/2027

Illinois Finance Authority·Illinois

64% match

Illinois Climate Pollution Reduction Grants: Stretch Code Adoption Grant Application - Fourth Round

Closes 12/31/2026Opened 6/15/2026