The National Park Service is seeking information from contractors for a riverbank stabilization project at Cuyahoga Valley National Park in Ohio. The project aims to repair, reconstruct, and stabilize the riverbank along the Towpath Trail to address erosion problems caused by frequent flooding and high-water events. The construction magnitude is estimated to be between $1,000,000 and $5,000,000, and the anticipated period of performance is 250 calendar days. The project requires attention due to safety concerns and repeated temporary closures and emergency repairs.
• The project is located at Eight Select Sites in Ohio.
• The surrounding areas include rural, urban, industrial, and residential areas with limited staging areas.
• The Park will remain open during construction, and contract activities and logistics must be structured to minimize visitor impact.
• The site requires protective measures to ensure the surrounding area remains undisturbed.
• The anticipated period of performance includes any potential weather shutdown and seasonal/other shutdowns mandated through the construction season.
You found this one too late. Don't find the next one too late.
Bid Banana searches open government bids across all 50 states, updated daily. Save a search once and we email you your new matches, daily or weekly, while there is still time to win them.