The Oregon Department of Fish and Wildlife is seeking a vendor to fabricate and deliver two stainless steel fish screen drums, constructed in a profile bar or wedgewire style, that meet National Oceanic and Atmospheric Administration (NOAA) criteria. The drums will be installed at two fish screen sites on the John Day River. The contractor will be responsible for fabricating and delivering the drums, and the Oregon Department of Fish and Wildlife will review and accept the delivery. The project includes the following tasks:
• Fabricate Fish Screen Drum for John Day River Site #19 (S-06-0214)
• Fabricate Fish Screen Drum for John Day River Site #20 (S-06-0375)
• Deliver both fabricated drums to the John Day Screen Shop
The payment methodology will be a one-time payment upon verification that the fish screen drums meet all specifications and are delivered to the John Day Screen Shop.
Some key points to consider:
• The contractor must meet the specifications outlined in the ITB, including material, dimensions, slot size, and structural requirements.
• The contractor must deliver the drums to the John Day Screen Shop by April 30, 2026.
• The Oregon Department of Fish and Wildlife will inspect the delivered drums to confirm compliance with NOAA criteria and project specifications.