Bid Banana
PricingBid helpAPILog inStart free trial
Log inStart free trial

Learn more

  • New York guideNew York Bids and Bidding Guide
  • Construction RFPsConstruction Bids and Bidding Guide
  • How to answer an RFPChoosing and Responding to Government Bids
More construction bids →Must-win bid? Bring in The Bid Lab →
Bid Banana
SearchPricingBid helpBrowse bidsAPISupportFAQPrivacy PolicyTerms of UseAI Use Policy

This website and its content is copyright of The Bid Lab © 2026. The Bid Lab is a trademark of Bid Lab, LLC. All rights reserved.

  1. Bid Banana
  2. ›Closed bids
  3. ›New York
  4. ›Construction
  5. ›LARGE SCALE INFRASTRUCTURE CAPITAL IMPROVEMENTS: MUNICIPAL…

City of Mount Vernon, NY·New York

LARGE SCALE INFRASTRUCTURE CAPITAL IMPROVEMENTS: MUNICIPAL WATER, STORMWATER AND WASTEWATER INFRASTRUCTURE MAINTENANCE [PREVENTATIVE AND CORRECTIVE]

Closes 4/27/2026$500k – $5MRequest for Proposal
Bid source

This opportunity has closed.

Bid Banana tracks 1.6M+ bids and awards across all 50 states. Save a search and we'll email your new matches, daily or weekly — so the next one reaches you with time to bid.

Get alerted next time

Description

The City of Mount Vernon is seeking a contractor to provide large scale infrastructure capital improvements for municipal water, stormwater, and wastewater infrastructure maintenance, including preventative and corrective construction maintenance. The contractor will be responsible for providing all materials, equipment, labor, and supervision for the work. The scope of work includes sanitary sewer system cleaning, televising/inspecting, testing, diagnosis, installation, repair, and replacement, as well as lead and non-lead water service line replacement, water main appurtenance work, and temporary and permanent potable water connections. The contractor will also be responsible for traffic control and pavement restoration. • Preventative maintenance services include regular inspections, camera (CCTV) inspections, cleaning and flushing, and repairs. • Corrective maintenance services include sewer line and structure repair, pipeline rehabilitation, pump station repairs, and pavement restoration. • The contractor must comply with all applicable federal, state, and local laws, regulations, and ordinances, including the City's engineering specifications and the Manual on Uniform Traffic Control Devices (MUTCD). • The contractor must also maintain accurate daily work records, provide documentation required for regulatory reporting, and comply with the City's sequencing, restoration, inspection, and acceptance protocols.

Attached files

The solicitation documents live at the source — open the bid source above to download them.

Contact

Ryan Ulrich(Procurement and Purchasing Manager)

[email protected]

(914) 665-2336

Key dates

Opened
2/27/2026
Questions due
3/18/2026
Pre-bid meeting
3/11/2026
Closes
4/27/2026

Last updated

Details

Type
Request for Proposal
Industry
Construction
NAICS
237110
Solicitation №
2.26

Budget estimate

$500,000 – $5,000,000

Based on the scope of work, the estimated budget for this contract could range from $500,000 to $5 million, depending on the specific services required and the duration of the contract. The City's budget for this project is not explicitly stated, but the scope of work suggests a significant investment in infrastructure maintenance and repair. Factors that may influence the budget include the complexity of the work, the materials and equipment required, and the number of personnel needed to complete the project.

AI estimate from the solicitation

Similar opportunities

Matched by Bid Banana AI™

Bid Banana · 1.6M+ bids and awards 🍌

You found this one too late. Don't find the next one too late.

Bid Banana searches open government bids across all 50 states, updated daily. Save a search once and we email you your new matches, daily or weekly, while there is still time to win them.

1.6M+
bids & awards
All 50
states
4,000+
agencies
Start your 7-day free trial

Plans from $49.99/month. Cancel anytime, no setup fees.

Built by The Bid Lab, answering RFPs since 2017.

City of Ontario·California

Top match · 74%

UT 1065 FY2026-27 Water Main Improvements

Closes 11/18/2026Opened 10/14/2026

Washougal, WA·Washington

73% match

Stormwater Filter Facility Maintenance

Closes 11/5/2026Opened 10/9/2026

City of Fargo·North Dakota

73% match

BR-27-C1 - Paving and Utility Rehab/Reconstruction

Closes 11/18/2026Opened 10/17/2026

Georgia City of Byron·Georgia

72% match

Stormwater Program Management

Closes 11/19/2026Opened 10/20/2026

City of Charlotte·North Carolina

72% match

Chatham Storm Drainage Improvement Project

Rolling / TBD closeOpened 6/15/2027

City of Charlotte·North Carolina

72% match

Service Water Improvements and Flow Meter Modifications

Rolling / TBD closeOpened 1/31/2026

Massachusetts Town of Hull·Massachusetts

72% match

Secondary Clarifiers, Grit & Building Upgrades

Closes 5/6/2027Opened 4/8/2026

Maryland Baltimore City Department of Public Works·Maryland

72% match

Drainage Repairs and Improvements at Various Locations

Closes 11/4/2026Opened 10/7/2026

City of San Diego·California

72% match

Pump Station 2 Improvements and Modernization (Advertisement Only : No BIDS)

Closes 12/10/2026Opened 10/28/2026

City of Charlotte·North Carolina

71% match

Log Cabin 937 Storm Drainage Improvement Project

Rolling / TBD closeOpened 12/15/2027

City of Charlotte·North Carolina

71% match

Collective AG Storm Water Drainage Improvement Project

Rolling / TBD closeOpened 3/15/2026

City of Douglas·Wyoming

71% match

Sanitary Sewer and Misc WWTP Improvements Project

Closes 11/3/2026Opened 10/16/2026

City of Charlotte·North Carolina

71% match

Reddman Road Storm Drainage Improvement Project

Rolling / TBD closeOpened 6/17/2026

City of Shawnee·Kansas

71% match

2027 Annual Stormwater Pipe Repair Project

Closes 11/12/2026Opened 10/22/2026

City of Charlotte·North Carolina

71% match

Hastings Princeton Storm Drainage Improvement Project

Rolling / TBD closeOpened 9/15/2027

Mississippi Department of Finance and Administration·Mississippi

71% match

Wastewater Facility Improvements (Sanitary Sewer) (GS# 101-309)

Closes 11/19/2026Opened 10/20/2026

City of Charlotte·North Carolina

71% match

Perth-Milton Storm Drainage Improvement Project

Rolling / TBD closeOpened 1/15/2028

City of Charlotte·North Carolina

71% match

Barrington Drive 5919 Storm Drainage Improvement Project

Rolling / TBD closeOpened 2/15/2027

City of Grand Rapids Department of Engineering·Michigan

70% match

Water Main and Water Main Lining, Adams Street – City of Grand Rapids

Closes 11/3/2026Opened 10/15/2026

City of Charlotte·North Carolina

70% match

Shamrock Drive Storm Drainage Improvement Project

Rolling / TBD closeOpened 4/15/2027

Town of Eatonville·Florida

70% match

Drinking Water – Phase 1

Closes 11/9/2026Opened 10/6/2026

City of Clearwater·Florida

70% match

Wastewater Collections Point Repair and Improvements

Closes 11/5/2026Opened 9/23/2026

City of Sanibel·Florida

70% match

WASTEWATER COLLECTION SYSTEM REPAIRS - PHASE 1

Closes 11/12/2026Opened 10/13/2026

City of West Miami·Florida

70% match

West Miami - City-Wide Stormwater Master Plan

Closes 11/24/2026Opened 10/22/2026

City of Charlotte·North Carolina

70% match

Gleneagles Storm Drainage Improvement Project

Rolling / TBD closeOpened 3/23/2026