Bid Banana
PricingBid helpAPILog inStart free trial
Log inStart free trial

Before you respond

  • Michigan guideMichigan Bids and Bidding Guide
  • Construction RFPsConstruction Bids and Bidding Guide
  • How to answer an RFQRFQ Meaning: What Is an RFQ?
More construction bids →Must-win bid? Bring in The Bid Lab →
Bid Banana
SearchPricingBid helpBrowse bidsAPISupportFAQPrivacy PolicyTerms of UseAI Use Policy

This website and its content is copyright of The Bid Lab © 2026. The Bid Lab is a trademark of Bid Lab, LLC. All rights reserved.

  1. Bid Banana
  2. ›Bids
  3. ›Michigan
  4. ›Construction
  5. ›472/26156.MDL; Chippewa C.F. Sanitary Sewer Upgrades

Department of Technology, Management and Budget (DTMB) / Michigan Department of Corrections (MDOC)·Michigan

472/26156.MDL; Chippewa C.F. Sanitary Sewer Upgrades

Closes in 3 days$5M – $15MRequest for Quotation
Get bids like this by emailBid source

Description

The State of Michigan, through DTMB and MDOC, is seeking qualified contractors to design, supply, install, and commission a dual‑auger washer‑compactor system as part of a sanitary‑sewer pretreatment and infrastructure upgrade at the Chippewa Correctional Facility in Kincheloe, MI. The scope includes detailed engineering, procurement of stainless‑steel equipment, electrical controls, installation, anchoring, testing, and one day of start‑up training. The contract follows the MICHSPEC 2008 Division 0 standard form and requires compliance with Michigan safety, environmental, and prevailing‑wage regulations. • Location: 4269 West M‑80, Kincheloe, MI 49784 • Project includes design, fabrication, delivery, installation, and commissioning of a custom washer‑compactor system for sewer pretreatment. • Must meet stringent mechanical, electrical, and explosion‑proof specifications (NEMA 12/4X/7/9, UL‑rated panels, stainless‑steel components). • Contractor responsible for site preparation, anchoring, wiring, plumbing, and final testing to verify performance (≤ 4 in. material depth). • Includes provision of on‑site technical assistance and one‑day start‑up training. • All work must adhere to MICHSPEC Division 0 contract terms, prevailing‑wage schedules, and applicable state and federal regulations.

Attached files

Contact

Kristi Zakrzewski

[email protected]

(517) 243-5669

Key dates

Opened
10/9/2026
Closes
11/4/2026

Last updated

Details

Type
Request for Quotation
Industry
Construction
NAICS
237110
Solicitation №
RFQ-171-270000000012-2

Budget estimate

$5,000,000 – $15,000,000

The solicitation does not disclose a contract value. Based on comparable correction‑facility sewer‑infrastructure upgrades that include custom stainless‑steel equipment, engineering, installation, and commissioning, total project costs typically range from $5 million to $15 million. The lower bound reflects a minimal equipment package and modest site conditions; the upper bound accounts for extensive custom fabrication, extensive electrical work, and the need for explosion‑proof components.

AI estimate from the solicitation

Similar opportunities

Matched by Bid Banana AI™

Bid Banana · 1.6M+ bids and awards 🍌

You found this one. Bid Banana has 1.6M+ bids and awards.

You found this bid by looking. Bid Banana searches open government bids across all 50 states, updated daily, so you stop hunting: save a search once and we email you your new matches, daily or weekly.

1.6M+
bids & awards
All 50
states
4,000+
agencies
Start your 7-day free trial

Plans from $49.99/month. Cancel anytime, no setup fees.

Built by The Bid Lab, answering RFPs since 2017.

Department of Technology, Management and Budget (DTMB) / Michigan Department of Corrections (MDOC)·Michigan

Top match · 98%

472/26156.MDL; Chippewa C.F. Sanitary Sewer Upgrades

Closes 11/4/2026Opened 10/8/2026

Michigan Department of Technology, Management and Budget (DTMB)·Michigan

98% match

472/26156.MDL; Chippewa C.F. Sanitary Sewer Upgrades

Closes 11/4/2026Opened 10/30/2026

Department of Technology, Management and Budget (DTMB) / Michigan Department of Corrections (MDOC)·Michigan

96% match

472/26156.MDL; Chippewa C.F. Sanitary Sewer Upgrades

Closes 11/4/2026Opened 10/23/2026

State of Michigan Department of Technology, Management and Budget·Michigan

82% match

472/26279.JLM; Lakeland C.F. - Softener & Salt Storage Upgrd

Closes 11/11/2026Opened 10/16/2026

State of Michigan Department of Technology, Management and Budget – State Facilities Administration, Design and Construction Division·Michigan

82% match

472/26279.JLM; Lakeland C.F. - Softener & Salt Storage Upgrd

Closes 11/11/2026Opened 10/29/2026

Michigan Department of Technology, Management and Budget – State Facilities Administration·Michigan

82% match

472/23129.KMM; Woodland C.F. - Site Mechanical Underground

Closes 11/18/2026Opened 10/22/2026

Michigan Department of Technology, Management and Budget – State Facilities Administration·Michigan

82% match

472/23129.KMM; Woodland C.F. - Site Mechanical Underground

Closes 11/18/2026Opened 10/19/2026

Michigan Department of Technology, Management and Budget – State Facilities Administration·Michigan

81% match

472/23129.KMM; Woodland C.F. - Site Mechanical Underground

Closes 11/18/2026Opened 10/12/2026

Michigan Department of Technology, Management and Budget (State Facilities Administration, Design & Construction Division)·Michigan

80% match

751/26170.MDL; Muskallonge S.P. - Water & Sanitary Imprvmnts

Closes 12/9/2026Opened 10/16/2026

Metropolitan Council·Minnesota

80% match

Coon Rapids 4-NS-525 Rehabilitation

Closes 11/10/2026Opened 9/24/2026

U.S. Department Of Agriculture·Minnesota

80% match

Septic Toilet Pumping for Chippewa National Forest

Closes 11/4/2026Opened 10/20/2026

State of Michigan – Department of Technology, Management and Budget (DTMB)·Michigan

80% match

751/26331.SAA; Hadley SRA - Minnawanna Dam Improvements

Closes 12/2/2026Opened 10/19/2026

City of Lynchburg·Virginia

79% match

CSO 70 SEWER IMPROVEMENTS

Closes 12/8/2026Opened 10/21/2026

U.S. Department Of Justice·Illinois

79% match

Replace Water Tanks FCI Marion Marions, Illinois

Closes 11/30/2026Opened 10/29/2026

Michigan Department of Transportation – Contract Services Division – Purchasing·Michigan

79% match

Septic Tank & Vault Pumping Services - MDOT Grand Region

Closes 11/12/2026Opened 10/23/2026

TOWNSHIP OF PARSIPPANY-TROY HILLS·New Jersey

79% match

Full Document: Request for Proposals. Sewer Utility Superintendent & Engineering Consultant 2026-2027

Closes 11/13/2026Opened 10/29/2026

City of Cedar Rapids·Iowa

79% match

Improvements to Sludge Conveyor Belt

Closes 11/5/2026Opened 10/21/2026

City of Ann Arbor·Michigan

79% match

2027 Sewer Lining Project

Closes 12/2/2026Opened 10/30/2026

City of Fort Myers·Florida

79% match

Michigan Avenue Utility Improvement Project

Closes 11/3/2026Opened 9/24/2026

Maryland Environmental Service - Procurement Division·Maryland

79% match

Dorsey Run Wastewater Treatment Plant Minor Upgrades - MBE 20%

Closes 11/6/2026Opened 9/23/2026

City of Independence·Missouri

79% match

2024 Neighborhood Sanitary Sewer CIP Project No. 302004-2

Closes 11/4/2026Opened 10/7/2026

TOWNSHIP OF PARSIPPANY-TROY HILLS·New Jersey

78% match

Request for Proposals: Sewer Utility Superintendent & Engineering Consultant 2026-202. For the full document, click on the header below

Closes 11/13/2026Opened 10/29/2026

Massachusetts Town of Hull·Massachusetts

78% match

Secondary Clarifiers, Grit & Building Upgrades

Closes 5/6/2027Opened 4/8/2026

Michigan Department of Health, Bureau of Engineering·Michigan

78% match

761/26157.JBB; Wells SP-Beach House Septic Sys Upgrades

Closes 11/12/2026Opened 10/22/2026

Connecticut Dept. of Correction·Connecticut

78% match

INSTALLATION OF IMPRESSED CURRENT CP SYSTEM

Closes 11/4/2026Opened 10/21/2026