The Lexington Harbor Breakwater Repair project involves breakwater repair operations at Lexington Harbor. The project objective is to alter the existing permeable rubble mound breakwater structure to an impermeable structure by constructing a grout curtain wall within the structure. The proposed scope of work includes reconstructing the existing Portland cement concrete walkway upon completion of grouting operations. The project includes the following key components:
• Breakwater repair by constructing a grout curtain wall
• Portland cement concrete walkway reconstruction
• Drilling and grouting operation labor, equipment, and materials
• Verification borings
• Topcoat void fill operation
• Handrail dismantling and reassembly
• Concrete cap demolition and replacement
The project is expected to require a significant amount of labor, equipment, and materials, and the contractor will need to have experience with breakwater repair and construction projects.
You found this one too late. Don't find the next one too late.
Bid Banana searches open government bids across all 50 states, updated daily. Save a search once and we email you your new matches, daily or weekly, while there is still time to win them.