The University seeks a qualified contractor to repair and refurbish the historic clock tower atop Eason Hall. Work includes removal and replacement of siding and trim on three tower sections, roof membrane and TPO replacement, reinstalling the existing clocks, and installing a new copper‑soldered flat‑lock apron. All activities must conform to the provided drawings, be completed within a 120‑day substantial‑completion window plus a 30‑day final‑completion period, and meet the university’s SWaM participation goal of 15 %.
• Replace lower‑tower siding/trim and tie into existing single‑ply roofing membrane.
• Remove, refurbish, and reinstall clock mechanisms; replace flat‑lock apron with fully soldered copper.
• Remove existing low‑slope roof and TPO membrane on the upper tower, replace damaged trim/railing, and install new roofing as specified.
You found this one too late. Don't find the next one too late.
Bid Banana searches open government bids across all 50 states, updated daily. Save a search once and we email you your new matches, daily or weekly, while there is still time to win them.