Bid Banana
PricingBid helpAPILog inStart free trial
Log inStart free trial

Learn more

  • Ohio guideOhio Bids and Bidding Guide
  • Pricing your bidWhy Your RFP Pricing Strategy Is Costing You
  • How to answer an IFBInvitation for Bid: You Just Received an IFB, Now What?
More water and wastewater bids →Must-win bid? Bring in The Bid Lab →
Bid Banana
SearchPricingBid helpBrowse bidsAPISupportFAQPrivacy PolicyTerms of UseAI Use Policy

This website and its content is copyright of The Bid Lab © 2026. The Bid Lab is a trademark of Bid Lab, LLC. All rights reserved.

  1. Bid Banana
  2. ›Closed bids
  3. ›Ohio
  4. ›Water and Wastewater
  5. ›City of Marysville – New Well #7

City of Marysville, Ohio·Ohio

City of Marysville – New Well #7

Closes 10/22/2026$500k – $700kInvitation for BidLogin required
Bid source

This opportunity has closed.

Bid Banana tracks 1.6M+ bids and awards across all 50 states. Save a search and we'll email your new matches, daily or weekly — so the next one reaches you with time to bid.

Get alerted next time

Description

The City of Marysville is soliciting bids for the design‑build construction of a new municipal water well (Well #7) capable of delivering ~1,000 gpm, including all associated civil, electrical, and mechanical work. The scope covers drilling a 12‑in × 16‑in bedrock well approximately 250 ft deep, installing a vertical‑turbine submersible pump with motor, constructing a valve/meter vault, providing all required piping, electrical distribution, conduit, control panels, flow‑meter instrumentation, and completing all testing, certification, and as‑built documentation. The contractor must also handle site preparation, grading, erosion control, utility coordination, environmental compliance, and obtain all necessary permits. • Drilling and constructing a 12‑in × 16‑in, 1,000 gpm rock well with casing, grout, and EPA‑required testing (step‑drawdown, 24‑hr constant‑rate). • Supplying and installing a 60 HP, 480 V submersible turbine pump, transformer, panels, conduit, grounding, and associated MEP systems. • Performing all civil works (excavation, back‑fill, site grading, valve vault, water‑line connections) and complying with Ohio EPA, OSHA, and local regulations. • Delivering complete documentation, as‑built drawings, operation & maintenance manuals, and providing a 12‑month warranty.

Attached files

Key dates

Opened
9/23/2026
Questions due
10/14/2026
Closes
10/22/2026
Projected award
11/5/2026
Duration
230 days

Last updated

Details

Type
Invitation for Bid
Industry
Water Management and Sanitation
NAICS
237110
Solicitation №
Solicitation 49215

Budget estimate

$500,000 – $700,000

The solicitation’s engineering estimate is approximately $600,000. Considering typical profit margins for design‑build water‑well projects (≈10‑15%), the contractor’s anticipated earnings would likely fall between $500,000 and $700,000, depending on final bid price, change‑order scope, and any cost‑saving measures employed. Factors influencing the range include site conditions, material costs, equipment rental rates, and the inclusion of the electrical/MEP components.

AI estimate from the solicitation

Similar opportunities

Matched by Bid Banana AI™

Bid Banana · 1.6M+ bids and awards 🍌

You found this one too late. Don't find the next one too late.

Bid Banana searches open government bids across all 50 states, updated daily. Save a search once and we email you your new matches, daily or weekly, while there is still time to win them.

1.6M+
bids & awards
All 50
states
4,000+
agencies
Start your 7-day free trial

Plans from $49.99/month. Cancel anytime, no setup fees.

Built by The Bid Lab, answering RFPs since 2017.

City of Marysville, Ohio·Ohio

Top match · 68%

2027 Wastewater Treatment Chemicals – Nitrate Solution

Closes 11/12/2026Opened 10/19/2026

City of Marysville, Ohio·Ohio

65% match

2027 Water Treatment Chemicals – Carbon Dioxide

Closes 11/12/2026Opened 10/19/2026

Missouri Department of Transportation·Missouri

64% match

NW District, City of Maryville, South Main Trail Connection Project

Closes 11/11/2026Opened 10/2/2026

City of Missouri City - Purchasing·Texas

64% match

MUSTANG BAYOU WATER PLANT #2 WELL IMPROVEMENTS

Closes 11/6/2026Opened 10/21/2026

Bossier Parish Police Jury·Louisiana

63% match

Goodwill Road at Highway 80 – Well #29 (Well #23 Replacement) – Consolidated Waterworks/Sewerage District No. 1

Closes 11/5/2026Opened 10/7/2026

Missouri Department of Transportation·Missouri

63% match

NW District, City of Maryville, South Mani Trail Connection Project

Closes 11/11/2026Opened 10/2/2026

Connecticut City of Meriden·Connecticut

63% match

Mule Well Rehabilitation

Closes 11/20/2026Opened 10/29/2026

Massachusetts Town of Ayer·Massachusetts

62% match

Well Cleaning and Redevelopment

Closes 11/13/2026Opened 10/14/2026

City of Maryville·Missouri

62% match

South Main Trail Connection Project - Maryville, MO

Closes 11/10/2026Opened 10/8/2026

Maryland Charles County Government·Maryland

62% match

MATTAWOMAN BEANTOWN WELL HOUSE IMPROVEMENTS

Closes 12/2/2026Opened 11/6/2026

City of Marysville, Ohio·Ohio

62% match

301 N. Main Street Parking Lot Construction Project

Closes 11/16/2026Opened 10/26/2026

City of Melbourne·Florida

62% match

Above Grade Wells 5 & 6

Closes 11/4/2026Opened 9/28/2026

Georgia City of Blairsville·Georgia

62% match

Ground Water Exploration and Development - Drilling Test Well #5

Closes 11/24/2026Opened 10/22/2026

Charles County Government·Maryland

62% match

Mattawoman Beantown Well House Improvements (UN#1301)

Closes 12/2/2026Opened 10/29/2026

Georgia City of Cartersville·Georgia

62% match

Project: Mechanicsville & Jones Mill Road Water Main Replacement

Closes 11/12/2026Opened 10/1/2026

Michigan Marysville Public Schools·Michigan

62% match

District Wide Remodeling Projects

Closes 11/5/2026Opened 10/27/2026

City of Meriden·Connecticut

61% match

RFP027-33 Mule Well Rehabilitation

Closes 11/20/2026Opened 10/29/2026

Goodwyn Mills Cawood·Georgia

61% match

Mechanicsville & Jones Mill Road Water Main Replacement

Closes 11/12/2026Opened 10/1/2026

City of Eau Claire·Wisconsin

61% match

Test Well Drilling

Closes 12/1/2026Opened 10/28/2026

City of Albany·Georgia

61% match

Well No. 21 Rehabilitation

Closes 11/16/2026Opened 10/12/2026

Connecticut City of Meriden·Connecticut

61% match

Evansville Well Rehabilitation

Closes 11/20/2026Opened 10/30/2026

Marion County·South Carolina

61% match

Marion County Paving Project

Closes 11/17/2026Opened 10/22/2026

Town of Eatonville·Florida

61% match

Drinking Water – Phase 1

Closes 11/9/2026Opened 10/6/2026

NYS Alden, Town of·New York

61% match

Townline Water District

Closes 11/4/2026Opened 10/9/2026

City of Charlottesville·Virginia

60% match

GEOTECHNICAL SERVICES FOR CITY

Closes 11/17/2026Opened 10/15/2026