The City of Pendleton is seeking a qualified contractor to rehabilitate two welded steel water storage tanks. The project includes surface preparation, coating, removal and replacement of compromised materials, reinstallation of structural and operational components, sealing, and disinfection of tanks upon completion. The contractor must comply with the City of Pendleton Public Works Standards, APWA specifications, and applicable federal, state, and local codes. The contractor is responsible for providing all labor, materials, and equipment, ensuring safety and traffic control, coordinating shutdowns with minimal service disruption, maintaining cleanliness and erosion control, and protecting existing structures, utilities, and water quality.
Key aspects of the project include:
• Rehabilitating two welded steel water storage tanks: the 1.8-million-gallon Water Filtration Plant (WFP) Clearwell and the 1.1-million-gallon Southwest Reservoir
• Surface preparation, coating, removal and replacement of compromised materials, reinstallation of structural and operational components, sealing, and disinfection of tanks upon completion
• Compliance with the City of Pendleton Public Works Standards, APWA specifications, and applicable federal, state, and local codes
• Providing all labor, materials, and equipment, ensuring safety and traffic control, coordinating shutdowns with minimal service disruption, maintaining cleanliness and erosion control, and protecting existing structures, utilities, and water quality