Bid Banana
PricingBid helpAPILog inStart free trial
Log inStart free trial

Learn more

  • Federal contracts (SAM.gov)The Ultimate Guide to SAM.gov Registration
  • Construction RFPsConstruction Bids and Bidding Guide
  • How to answer an RFIRFI Meaning: What Is an RFI?
More construction bids →Must-win bid? Bring in The Bid Lab →
Bid Banana
SearchPricingBid helpBrowse bidsAPISupportFAQPrivacy PolicyTerms of UseAI Use Policy

This website and its content is copyright of The Bid Lab © 2026. The Bid Lab is a trademark of Bid Lab, LLC. All rights reserved.

  1. Bid Banana
  2. ›Closed bids
  3. ›Federal
  4. ›EIectron-Ion Collider Conventional Facilities Construction

U.S. Department Of Energy·New York

EIectron-Ion Collider Conventional Facilities Construction

Closes 1/30/2026$50M – $200MRequest for Information
Bid source

This opportunity has closed.

Bid Banana tracks 1.6M+ bids and awards across all 50 states. Save a search and we'll email your new matches, daily or weekly — so the next one reaches you with time to bid.

Get alerted next time

Description

The Electron-Ion Collider (EIC) Conventional Facilities Construction project involves the construction of new facilities at Brookhaven National Laboratory. The project includes earthwork, electrical distribution, building construction, and site utilities. The contractor will be responsible for providing all necessary labor, materials, and equipment to complete the project. The project is expected to last approximately 149 weeks. Key aspects of the project include: • Earthwork and excavation for new buildings • Electrical distribution and power supply systems • Building construction, including structural foundations and pre-engineered metal building systems • Site utilities, including water distribution, sanitary force main, and storm drainage • Environmental safety and health requirements, including job hazard analysis and safety programs • Quality assurance and control, including inspection and testing of materials and workmanship • Coordination with lower-tier subcontractors and construction management • Compliance with applicable laws and regulations, including environmental and safety regulations

Attached files

Contact

Eric Nagel

[email protected]

Key dates

Opened
1/22/2026
Closes
1/30/2026
Duration
149 weeks

Last updated

Details

Type
Request for Information
Industry
Construction
NAICS
236220
Solicitation №
SS_APP00004

Budget estimate

$50,000,000 – $200,000,000

The budget for this project can be estimated based on the scope and complexity of the work. The project involves the construction of new facilities, including buildings and site utilities, which suggests a significant investment. Considering the project duration of approximately 149 weeks, the budget could be substantial. A rough estimate for a project of this scale could be in the range of $50 million to $200 million, considering the costs of labor, materials, equipment, and other expenses. However, this is a very rough estimate and the actual budget could be higher or lower, depending on various factors such as the specific requirements of the project, the contractor's experience and expertise, and the prevailing market conditions.

AI estimate from the solicitation

Similar opportunities

Matched by Bid Banana AI™

Bid Banana · 1.6M+ bids and awards 🍌

You found this one too late. Don't find the next one too late.

Bid Banana searches open government bids across all 50 states, updated daily. Save a search once and we email you your new matches, daily or weekly, while there is still time to win them.

1.6M+
bids & awards
All 50
states
4,000+
agencies
Start your 7-day free trial

Plans from $49.99/month. Cancel anytime, no setup fees.

Built by The Bid Lab, answering RFPs since 2017.

U.S. Department Of Energy·New York

Top match · 66%

A-E Services for Electron Injector Complex

Closes 11/30/2026Opened 10/23/2026

U.S. Department Of Energy·New York

65% match

Prototype Stripline Kickers

Closes 12/4/2026Opened 10/20/2026

U.S. Department Of Energy·Illinois

64% match

Central Utility Building Addition and Renovation Construction, UIP Subproject 1-CUB

Closes 12/17/2026Opened 10/6/2026

Terrebonne Levee and Conservation District·Louisiana

63% match

District Building / Satellite EOC Facility

Closes 11/24/2026Opened 10/23/2026

State of Michigan – Department of Technology, Management and Budget (Design and Construction Division)·Michigan

62% match

472/25278.RWG; Ionia C.F. - IT Room Expansion

Closes 11/18/2026Opened 10/22/2026

NYS Empire AI Consortium, Inc·New York

62% match

Computing Assets and White Space Infrastructure Advanced SI/AI and HPC Computing Infrastructure • Up to 5 MW IT Load

Closes 12/4/2026Opened 10/29/2026

Clear Creek ISD·Texas

62% match

Brookside, League City, Space Center Intermediate School Renovations

Closes 11/3/2026Opened 10/6/2026

City of Gallup·New Mexico

62% match

Turnkey-Engineering, Procurement and Construction (EPC) for New Carbon Coal Electrical Substation

Closes 11/6/2026Opened 7/24/2026

The University of Iowa·Iowa

62% match

UI Health Care - John W. Colloton Pavilion - LL - Replace MRI in Room 0457 ID075

Closes 11/10/2026Opened 10/21/2026

U.S. National Institutes of Health·United States of America

62% match

Development of Collaborative Research Facilities or Research-Resource Facilities (C06 Clinical Trial Not Allowed)

Closes 1/25/2028Opened 6/17/2025

U.S. National Science Foundation·United States of America

61% match

EPSCoR Research Infrastructure Improvement Program: EPSCoR Research Incubators for STEM Excellence (E-RISE)

Closes 8/10/2027Opened 12/14/2024

Iowa Department of Administrative Services·Iowa

61% match

DOC ICIW IPI Building Heating Unit Replacements

Closes 11/18/2026Opened 10/26/2026

U.S. Department Of Veterans Affairs·California

61% match

Amendment 0002 Y1DZ--36C261-28-AP-0022 | 612-27-1-6009-0001 | Construct Modular Imaging Center in Stockton | 612A4-CSI-002

Closes 12/4/2026Opened 9/30/2026

Wyoming Department of Transportation·Wyoming

61% match

NATIONAL ELECTRIC VEHICLE INFASTRUCTURE PROGRAM

Closes 11/18/2026Opened 9/23/2026

Clear Creek ISD·Texas

61% match

Brookside, League City, Space Center Intermediate School Renovations

Closes 11/3/2026Opened 10/6/2026

U.S. Department Of Defense·Maryland

61% match

W912DR26X1B2N

Closes 1/8/2027Opened 1/8/2026

U.S. Department Of Defense·United States of America

61% match

Market Intelligence - Progressive Design-Build - Blood Donation Center

Closes 11/9/2026Opened 10/23/2026

Iowa Department of Administrative Services·Iowa

61% match

DOC ICIW IPI Building Heating Unit Replacements

Closes 11/18/2026Opened 10/26/2026

U.S. Department Of Energy·Ohio

61% match

Accelerator-Driven Sub-Critical Molten-Salt Assembly (ADS+MSA Facility)

Closes 12/22/2026Opened 6/23/2026