The City of Azusa’s municipal water utility (Azusa Light & Water) is seeking a qualified civil/municipal‑water consulting engineering firm to produce a comprehensive feasibility study for adding an interconnected supplemental water‑supply source. The study must evaluate four candidate alternatives, perform hydraulic, economic, and risk analyses, and recommend a preferred alternative with a preliminary design package. The effort is time‑critical, requiring a 120‑day delivery schedule after award and includes detailed memoranda, design concepts, and a final presentation.
• Evaluate four water‑supply interconnection alternatives (technical, economic, risk, regulatory).
• Deliver a series of technical memoranda, preliminary design package, and a final feasibility report within 120 calendar days post‑award.
• Provide comprehensive hydraulic modeling, engineering economics, risk assessment, permitting/rights‑of‑way analysis, and implementation schedule.
Attached files
Contact
Terry Kerger(Water Systems Engineer – Water Operations)
You found this one too late. Don't find the next one too late.
Bid Banana searches open government bids across all 50 states, updated daily. Save a search once and we email you your new matches, daily or weekly, while there is still time to win them.