The district seeks a qualified professional‑services firm to develop a comprehensive 10‑year (2027‑2037) Facilities Master Plan covering Foothill College, De Anza College, the Sunnyvale Education Center, central services, and student housing. The effort is divided into three phases: (1) site verification and existing campus analysis, (2) development of campus‑ and central‑services‑specific master plans, and (3) final deliverables and presentations. The consultant will conduct site visits, facilitate vision‑statement workshops, perform quantitative modeling of space, infrastructure, energy, and deferred‑maintenance, produce schematic site plans, sustainability reviews, capital‑improvement cost estimates, and deliver at least two perspective renderings. The final plan must be presented to senior staff, faculty, students, and the Board of Trustees by July 2027.
• Conduct on‑site verification, data collection, and stakeholder workshops across all campuses and central facilities.
• Produce detailed space‑inventory, capacity‑load ratios, deferred‑maintenance budgets, and capital‑improvement prioritization with total cost of ownership estimates.
• Integrate sustainability goals (decarbonization, Measure G projects) and develop design guidelines, schematic site plans, and visual renderings for Board presentation.