Bid Banana
PricingBid helpAPILog inStart free trial
Log inStart free trial

Learn more

  • Missouri guideMissouri Bids and Bidding Guide
  • Before you submitBid Response: 3 Common Mistakes When Submitting an RFP
More engineering services bids →Must-win bid? Bring in The Bid Lab →
Bid Banana
SearchPricingBid helpBrowse bidsAPISupportFAQPrivacy PolicyTerms of UseAI Use Policy

This website and its content is copyright of The Bid Lab © 2026. The Bid Lab is a trademark of Bid Lab, LLC. All rights reserved.

  1. Bid Banana
  2. ›Closed bids
  3. ›Missouri
  4. ›Engineering Services
  5. ›BRUSH CREEK TRAIL FROM HAMPTON TO NW 76TH STREET

Platte County·Missouri

BRUSH CREEK TRAIL FROM HAMPTON TO NW 76TH STREET

Closes 9/21/2026$300k – $600kRequest for Qualification
Bid source

This opportunity has closed.

Bid Banana tracks 1.6M+ bids and awards across all 50 states. Save a search and we'll email your new matches, daily or weekly — so the next one reaches you with time to bid.

Get alerted next time

Description

Platte County, Missouri is seeking a qualified consulting engineering firm to provide professional design and limited construction‑administration services for the Brush Creek Trail extension (approximately 2 mi) between Hampton Road and NW 76th Street. The consultant will develop conceptual through construction‑ready drawings, conduct hydrologic and hydraulic analyses, design three pedestrian‑bridge structures, prepare FEMA “No‑Rise” compliance documentation, and support permitting, utility coordination, and shop‑drawing review. The effort includes project management, data collection, surveying, geotechnical coordination, cost estimating, and preparation of a full PS&E package for the bridge components. Submissions consist of a Letter of Interest (≤ 6 pages) and a Statement of Qualifications (≤ 10 pages).

Attached files

The solicitation documents live at the source — open the bid source above to download them.

Contact

Wes Minder

[email protected]

(816) 200-7443

Key dates

Opened
8/18/2026
Questions due
9/14/2026
Closes
9/21/2026

Last updated

Details

Type
Request for Qualification
Industry
Engineering Services
NAICS
541330
Solicitation №
RFQ 2026-002

Budget estimate

$300,000 – $600,000

The County estimates total construction cost at about $6 million. Engineering design and related consulting services typically represent 5‑10 % of construction cost for bridge‑focused transportation projects. Assuming a 7 % design fee yields an estimated contract value between $300,000 and $600,000, depending on the final scope, level of detail, and any additional environmental or permitting services required.

AI estimate from the solicitation

Similar opportunities

Matched by Bid Banana AI™

Bid Banana · 1.6M+ bids and awards 🍌

You found this one too late. Don't find the next one too late.

Bid Banana searches open government bids across all 50 states, updated daily. Save a search once and we email you your new matches, daily or weekly, while there is still time to win them.

1.6M+
bids & awards
All 50
states
4,000+
agencies
Start your 7-day free trial

Plans from $49.99/month. Cancel anytime, no setup fees.

Built by The Bid Lab, answering RFPs since 2017.

Cobb County·Georgia

Top match · 64%

Chattahoochee River Trail – FM SR 139 to Nickajack Creek – Phase II Public Notice of Advertisement

Closes 4/8/2027Opened 9/21/2026

City of Hampton·Virginia

62% match

ITB 27-15/TM LITTLE BACK RIVER ROAD RECONSTRUCTION

Closes 11/3/2026Opened 9/30/2026

County of Fairfax·Virginia

61% match

Advertisement for Bid for the Little River Turnpike Walkway – Eastbound

Closes 11/30/2026Opened 10/30/2026

City of Green Cove Springs·Florida

61% match

St. Johns River Trail - Phase 1 (Design)

Closes 11/9/2026Opened 10/8/2026

Environmental Conservation, NYS Department of·New York

61% match

2027 Cold River Horse Trail Backcountry Maintenance

Closes 11/18/2026Opened 10/14/2026

City of Hampton·Virginia

61% match

ITB 27-03TM Landscape & Turf Maintenance

Closes 6/1/2027Opened 6/3/2026

Georgia Cobb County Department of Transportation·Georgia

60% match

B2432 - Chattahoochee River Trail, Phase II

Closes 1/15/2027Opened 9/28/2026

City of Gainesville - Procurement Division·Florida

60% match

Sweetwater Recreational Trail Phase 2 (Sweetwater Wetlands Park to Sweetwater Preserve)

Closes 11/12/2026Opened 10/14/2026

City of Middletown·Connecticut

60% match

Pistol Creek Multi-Use Trail

Closes 12/2/2026Opened 10/30/2026

City of Keene·New Hampshire

60% match

THT Phase#2, NHDOT#45251 Design Project

Closes 11/19/2026Opened 10/9/2026

Kenosha County·Wisconsin

60% match

Pike Mountain Bike Trail Restoration and Improvements

Closes 11/5/2026Opened 10/9/2026

City of Green Bay·Wisconsin

60% match

Pike Hike Mountain Bike Trail restoration and Improvements

Closes 11/5/2026Opened 10/9/2026

Connecticut Town of Simsbury·Connecticut

60% match

Curtiss Park Trail State Project No. 128-158

Closes 11/17/2026Opened 10/15/2026

Minnesota Department of Administration·Minnesota

60% match

Minnesota Valley State Trail; Nine Mile Creek to Interstate 35W

Closes 11/17/2026Opened 10/15/2026

Open Space Institute·South Carolina

59% match

Meadows Boardwalk Trail Number

Closes 11/16/2026Opened 10/29/2026

Texas Williamson County·Texas

59% match

Brushy Creek Trail Retaining Wall

Closes 11/23/2026Opened 10/12/2026

Maryland Howard County Government·Maryland

59% match

IFB-2027-19 PATUXENT BRANCH TRAIL IMPROVEMENTS

Closes 12/23/2026Opened 10/24/2026

Open Space Institute·South Carolina

59% match

The Meadows Boardwalk Trail Project

Closes 11/13/2026Opened 10/23/2026

Iowa City·Iowa

59% match

Highway 6 Trail - Broadway Street to Fairmeadows Boulevard Iowa DOT Project Number: TAP-U-3715(674)--8I-52

Closes 11/17/2026Opened 10/21/2026

City of Hampton·Virginia

59% match

ITB 27-15/TM LITTLE BACK RIVER ROAD RECONSTRUCTION

Closes 11/3/2026Opened 10/2/2026

City of Charlotte·North Carolina

59% match

Margaret Wallace Road Sidewalk Summerfield Ridge Ln to Marshbrooke Rd

Rolling / TBD closeOpened 7/1/2028

Haines Borough·Alaska

59% match

Snow Removal for Historic Dalton Trail (Eagle Vista Subdivision)

Rolling / TBD closeOpened 9/24/2026

City of Goshen, Indiana·Indiana

58% match

Cherry Creek Trailway, Phase I

Closes 11/5/2026Opened 10/17/2026

Howard County, Office of Procurement·Maryland

58% match

Patuxent Branch Trail Improvements

Closes 12/23/2026Opened 10/23/2026

U.S. Department Of Transportation·New Jersey

58% match

NJ-NY ERFO FW WARI 2019-1(1) - Wallkill River National Wildlife Refuge

Closes 12/15/2026Opened 10/28/2026