Bid Banana
PricingBid helpAPILog inStart free trial
Log inStart free trial

Learn more

  • Texas guideTexas Bids and Bidding Guide
  • Construction RFPsConstruction Bids and Bidding Guide
  • How to answer an RFPChoosing and Responding to Government Bids
More construction bids →Must-win bid? Bring in The Bid Lab →
Bid Banana
SearchPricingBid helpBrowse bidsAPISupportFAQPrivacy PolicyTerms of UseAI Use Policy

This website and its content is copyright of The Bid Lab © 2026. The Bid Lab is a trademark of Bid Lab, LLC. All rights reserved.

  1. Bid Banana
  2. ›Closed bids
  3. ›Texas
  4. ›Construction
  5. ›Cedar Creek Section 4 Pipeline Replacement and Cedar Creek…

Tarrant Regional Water District·Texas

Cedar Creek Section 4 Pipeline Replacement and Cedar Creek Lake Pump Station Improvements

Closes 9/25/2026$30M – $70MRequest for Proposal
Bid source

This opportunity has closed.

Bid Banana tracks 1.6M+ bids and awards across all 50 states. Save a search and we'll email your new matches, daily or weekly — so the next one reaches you with time to bid.

Get alerted next time

Description

The Tarrant Regional Water District (TRWD) is soliciting proposals for a multi‑component civil‑construction project that includes (1) the installation of an 8.3‑mile, 90‑inch water transmission pipeline (Section IV) from the Cedar Creek Pump Station to a point east of the Trinity River, (2) chemical‑feed upgrades at the Cedar Creek (CC1) pump station—including a new high‑head caustic feed system, relocation of low‑head feed, and construction of a new sample‑analyzer building—and (3) improvements at the Ennis (CC2) pump station, notably the installation of monolithic isolation joints. The scope also covers trenchless tunnel crossings of a state highway, an energy‑transfer gas line, and a north header, as well as cathodic protection, utility coordination, and flood‑plain work planning. TRWD will provide major process valves (two 72‑in. and one 90‑in. butterfly valves) with delivery expected between November 2027 and December 2028, requiring the contractor to remobilize for installation. The project must maintain continuous water‑system operation, adhere to 10‑year and 100‑year flood‑plain constraints, and coordinate with multiple agencies (TxDOT, ARCOSA, county road authorities). • 8.3 mi, 90‑in. water pipeline (Section IV) • Chemical‑feed system upgrades at Cedar Creek Pump Station (CC1) • Isolation‑joint installation at Ennis Pump Station (CC2) • Three trenchless tunnel crossings (State Highway 274, gas line, north header) • Owner‑furnished major valves with staged delivery (Nov 2027 – Dec 2028) • Required coordination with TxDOT, ARCOSA, county roads, and flood‑plain management • Continuous operation of water system must be maintained during construction.

Attached files

The solicitation documents live at the source — open the bid source above to download them.

Contact

Damon Cunningham

[email protected]

(817) 228-6982

Key dates

Opened
8/13/2026
Questions due
9/10/2026
Pre-bid meeting
8/20/2026
Closes
9/25/2026

Last updated

Details

Type
Request for Proposal
Industry
Construction
NAICS
237110
Solicitation №
26-088

Budget estimate

$30,000,000 – $70,000,000

Based on the scope—an 8.3‑mile, 90‑inch water pipeline, major pump‑station chemical‑feed upgrades, three trenchless tunnel crossings, provision of large‑diameter butterfly valves, and extensive coordination and flood‑plain mitigation—the contract is likely to be a high‑value civil‑construction award. Comparable water‑infrastructure projects of this size typically range from $30 million to $70 million, depending on site conditions, material costs, and schedule constraints. Therefore, a reasonable estimate for the total contract value is between $30 M and $70 M.

AI estimate from the solicitation

Similar opportunities

Matched by Bid Banana AI™

Bid Banana · 1.6M+ bids and awards 🍌

You found this one too late. Don't find the next one too late.

Bid Banana searches open government bids across all 50 states, updated daily. Save a search once and we email you your new matches, daily or weekly, while there is still time to win them.

1.6M+
bids & awards
All 50
states
4,000+
agencies
Start your 7-day free trial

Plans from $49.99/month. Cancel anytime, no setup fees.

Built by The Bid Lab, answering RFPs since 2017.

Tarrant Regional Water District·Texas

Top match · 71%

Cedar Creek Section 2 Phase 2 Pipeline Replacement

Closes 12/10/2026Opened 10/29/2026

City of Waynesboro·Virginia

67% match

Shenandoah Village Drive Pump Station Replacement and System Improvements Contract I

Closes 11/10/2026Opened 9/30/2026

City of Redlands·California

67% match

2026 CIP Water Pipeline Replacement Project

Closes 11/16/2026Opened 10/29/2026

City of Hilliard, Ohio·Ohio

66% match

Heritage Lakes No 1 Lift Station Replacement (CIP S-48)

Closes 11/19/2026Opened 10/29/2026

City of Holly Grove·Arkansas

66% match

Water System Improvements – Waterline Replacement

Closes 11/18/2026Opened 10/25/2026

City of DeLand·Florida

66% match

2026 PARTS A-C, & F WALTS AVE & NEW ST WATER MAIN IMPROVEMENTS

Closes 11/12/2026Opened 10/9/2026

City of Charlotte·North Carolina

65% match

Cedar Croft Dr 6315 Ph 2 Storm Drainage Improvement Project

Rolling / TBD closeOpened 4/20/2026

U.S. Department Of Defense·California

65% match

BRINE PIPELINE ACCESS IMPROVEMENTS

Closes 2/4/2027Opened 8/12/2026

City of San Diego·California

65% match

Pump Station 2 Improvements and Modernization (Advertisement Only : No BIDS)

Closes 12/10/2026Opened 10/28/2026

City of Charlotte·North Carolina

65% match

Four Mile Creek Rd 9427 Storm Drainage Improvement Project

Rolling / TBD closeOpened 4/9/2026

Santa Maria-Bonita School District·California

65% match

BONITA SCHOOL DRINKING WATER IMPROVEMENTS

Closes 12/14/2026Opened 10/30/2026

City of Charlotte·North Carolina

65% match

Lancer Dr 6818 Storm Drainage Improvement Project

Rolling / TBD closeOpened 10/19/2026

Johnson County Wastewater·Kansas

65% match

Notice - Progressive Design Build (PDB) Services for the Brush Creek Pump Station Improvements

Rolling / TBD closeOpened 11/4/2026

U.S. Department Of Health And Human Services·South Dakota

65% match

Rosebud Lift Station Construction

Closes 12/1/2026Opened 10/27/2026

Clermont County - Board of Commissioners·Ohio

65% match

Branch Hill Guinea Road Water Main Replacement (Branch Hill Miamiville Road to Loveland Miamiville Road)

Closes 11/19/2026Opened 10/21/2026

Gwinnett County Government·Georgia

65% match

Beaver Ruin Diversion Pump Station Grinders Replacements Project

Closes 11/20/2026Opened 10/7/2026

Town of Eatonville·Florida

65% match

Drinking Water – Phase 1

Closes 11/9/2026Opened 10/6/2026

City of Cedar Rapids·Iowa

65% match

Cedar Lake Amenities Bid Package 3B: Recreational Amenities

Closes 11/18/2026Opened 10/22/2026

Eastern Municipal Water District·California

65% match

Lindenberger Road Pipeline Replacement

Closes 11/17/2026Opened 10/20/2026