The USNS RAPPAHANNOCK (T-AO 204) Midterm Availability is a ship repair project that includes a wide range of tasks such as hull and structural repairs, propulsion machinery overhauls, electrical work, and habitability outfitting and furnishings. The project is tentatively scheduled for the end of calendar year 2026 and will be performed at a contractor shipyard in the Seventh Fleet Area of Responsibility (AOR). The contractor will be required to perform various tasks including, but not limited to, non-destructive testing, steel repairs, preservation of tanks and voids, and overhaul of main engines and reduction gears.
Some of the key tasks include:
• Hull and structural repairs
• Propulsion machinery overhauls
• Electrical work
• Habitability outfitting and furnishings
• HVAC and drydocking work
The contractor must have an active registration in the System for Awards Management (SAM.gov) and be authorized to do business in the country of performance.
You found this one too late. Don't find the next one too late.
Bid Banana searches open government bids across all 50 states, updated daily. Save a search once and we email you your new matches, daily or weekly, while there is still time to win them.