The City of Emerson, Georgia is soliciting sealed bids for the Old Alabama Road Drainage Improvements project. The project involves the installation of approximately 425 linear feet of 18-inch reinforced concrete storm sewer, along with associated manholes, inlets, end sections, rip rap, bituminous paving, earthwork, erosion and sedimentation control, utility coordination, and restoration. The work includes construction near existing utilities and within a tributary draining to the Etowah River/Lake Allatoona system.
• The project requires a 5% Bid Bond and the successful bidder must provide performance and payment bonds.
• The contractor will be responsible for field verification, potholing of utilities, and providing as-built drawings at project completion.
• The project shall be substantially complete within 75 calendar days and finally complete within 90 calendar days from the Notice to Proceed.
• A GDOT access permit has been approved for work at the intersection with Highway 293.
• The contractor must have a valid Georgia contractor's license and comply with state and federal work authorization requirements.