The Ohio Department of Natural Resources is seeking bids for Phase 2 of the Clifton Gorge Narrow’s Trail ADA improvement project. The work includes replacing three existing wooden pedestrian bridges with a prefabricated 140‑ft FRP bridge system, expanding and resurfacing a parking lot, and associated site grading, drainage, erosion‑control, and landscaping. The contract is a lump‑sum, electronic bid with an estimated total value of $454,566 and a completion date of April 15, 2027.
• Replace three wooden bridges with a 140‑ft FRP bridge (20 ft, 40 ft, 80 ft spans) including abutments, decking, railings, and concrete substructures.
• Expand parking lot (380 sq yd new asphalt) and seal/stripe 1,100 sq yd existing pavement.
• Provide site grading, drainage, erosion‑control, turf‑seeding, and compliance with prevailing‑wage, EDGE‑participation, domestic‑steel, and DFSP requirements.
• Bids submitted electronically via BidExpress; pre‑bid meeting on July 10, 2026 (strongly encouraged) and bid deadline July 23, 2026.