The East Lake Booster Pump Station (BPS) Relocation project involves the construction of a replacement BPS on the existing site, as well as approximately 5,000 linear feet of new water main outside of the existing BPS property. The new BPS will have features such as horizontal split case pumps, site piping, standby power generator, and a climate-controlled electrical room. The project also includes pre-construction consultation and demolition of the existing BPS interior. The successful proposer will be selected based on the information contained in the proposals and potential interviews.
• The project requires the construction of a new BPS building with a roll-up door and crane system for pump removal/access.
• The new BPS will have a climate-controlled electrical room with new switchgear and VFDs.
• The project includes the installation of approximately 5,000 linear feet of new water main.
• The successful proposer will not be required to provide Performance and Payment Bonds for Pre-Construction Services Contract.
• The Owner reserves the right to reject all proposals and waive irregularities and informalities.
You found this one too late. Don't find the next one too late.
Bid Banana searches open government bids across all 50 states, updated daily. Save a search once and we email you your new matches, daily or weekly, while there is still time to win them.