Bid Banana
PricingBid helpAPILog inStart free trial
Log inStart free trial

Learn more

  • Federal contracts (SAM.gov)The Ultimate Guide to SAM.gov Registration
  • How to answer an RFIRFI Meaning: What Is an RFI?
More civil engineering bids →Must-win bid? Bring in The Bid Lab →
Bid Banana
SearchPricingBid helpBrowse bidsAPISupportFAQPrivacy PolicyTerms of UseAI Use Policy

This website and its content is copyright of The Bid Lab © 2026. The Bid Lab is a trademark of Bid Lab, LLC. All rights reserved.

  1. Bid Banana
  2. ›Closed bids
  3. ›Federal
  4. ›Long Run Watershed Stabilization Project

U.S. Department Of Defense·Pennsylvania

Long Run Watershed Stabilization Project

Closes 12/23/2025$150k – $220kRequest for Information
Bid source

This opportunity has closed.

Bid Banana tracks 1.6M+ bids and awards across all 50 states. Save a search and we'll email your new matches, daily or weekly — so the next one reaches you with time to bid.

Get alerted next time

Description

The Long Run Watershed Stabilization Project involves the excavation and removal of debris from an existing culvert pipe channel, associated structures, and abandoned utilities. The project also includes the installation of a new precast modular block gravity retaining wall and the replacement of an existing 18” culvert pipe with a new one. The contractor will be responsible for restoring vegetation, concrete, and pavement in the surrounding areas. The project is expected to take 365 calendar days to complete, and the magnitude of construction is between $100,000 and $250,000. • The project requires the excavation and removal of debris from the existing culvert pipe channel. • The installation of a new precast modular block gravity retaining wall is required. • The replacement of the existing 18” culvert pipe with a new one is necessary. • The contractor must restore vegetation, concrete, and pavement in the surrounding areas. • The project is expected to take 365 calendar days to complete. • The magnitude of construction is between $100,000 and $250,000.

Attached files

The solicitation documents live at the source — open the bid source above to download them.

Contact

Aaron Barr(Contract Specialist)

[email protected]

(412) 395-7157

Key dates

Opened
12/9/2025
Closes
12/23/2025
Duration
365 days

Last updated

Details

Type
Request for Information
Industry
Civil Engineering
NAICS
237990
Solicitation №
W911WN26Q1AZ7

Budget estimate

$150,000 – $220,000

The budget for this project can be estimated based on the magnitude of construction, which is between $100,000 and $250,000. Considering the scope of work, which includes excavation, removal of debris, installation of a new precast modular block gravity retaining wall, and replacement of an existing culvert pipe, the budget is likely to be closer to the higher end of the range. The contractor will also be responsible for restoring vegetation, concrete, and pavement in the surrounding areas, which may add to the overall cost. The estimated budget range is $150,000 to $220,000, with the most likely budget being around $185,000. Factors that may influence the likely payment range include the complexity of the project, the materials and equipment required, and the labor costs.

AI estimate from the solicitation

Similar opportunities

Matched by Bid Banana AI™

Bid Banana · 1.6M+ bids and awards 🍌

You found this one too late. Don't find the next one too late.

Bid Banana searches open government bids across all 50 states, updated daily. Save a search once and we email you your new matches, daily or weekly, while there is still time to win them.

1.6M+
bids & awards
All 50
states
4,000+
agencies
Start your 7-day free trial

Plans from $49.99/month. Cancel anytime, no setup fees.

Built by The Bid Lab, answering RFPs since 2017.

California Grants·California

Top match · 71%

Watershed Resilience Conservation Implementation

Rolling / TBD closeOpened 8/4/2026

Washakie County Conservation District·Wyoming

66% match

Big Horn River Bank Stabilization Project

Closes 12/1/2026Opened 10/29/2026

U.S. Bureau of Reclamation·United States of America

66% match

WaterSMART Cooperative Watershed Management Program

Closes 2/15/2028Opened 6/10/2026

California Grants·California

66% match

Proposition 1 Watershed Restoration Grant Program

Rolling / TBD closeOpened 6/18/2025

California Grants·California

65% match

Baldwin Hills & Urban Watersheds Conservancy (BH UWC) Proposition 4: Community and Climate Resilience Grant Program

Rolling / TBD closeOpened 5/6/2026

California Grants·California

65% match

Urban Streams Restoration Program

Rolling / TBD closeOpened 10/1/2026

City of Austin·Texas

64% match

Williamson Creek - Tributary 4 Channel Stabilization

Rolling / TBD closeOpened 9/28/2026

California Grants·California

64% match

Proposition 68 Rivers and Streams Grant Program – Klamath-Trinity Watershed

Rolling / TBD closeOpened 6/17/2025

California Grants·California

64% match

Proposition 1 Lower Los Angeles River Grants

Rolling / TBD closeOpened 1/27/2025

City of Anderson·South Carolina

64% match

Branchcliff Lane Streambank Stabilization

Closes 11/2/2026Opened 10/12/2026

California Grants·California

64% match

Baldwin Hills & Urban Watersheds Conservancy (BH UWC) Consolidated Grant Program

Rolling / TBD closeOpened 10/9/2025

California Grants·California

64% match

Proposition 1 Delta Water Quality and Ecosystem Restoration Grant Program

Rolling / TBD closeOpened 6/18/2025

California Grants·California

63% match

RMC Lower LA River Grant Program

Rolling / TBD closeOpened 11/19/2024

California Grants·California

63% match

Stream Flow Enhancement

Rolling / TBD closeOpened 6/6/2025

California Grants·California

63% match

Proposition 68 Rivers and Streams Grant Program

Rolling / TBD closeOpened 6/18/2025

Township of North Brunswick·New Jersey

63% match

West Lawrence Pump Station Bank Stabilization Project

Closes 11/17/2026Opened 10/29/2026

Environmental Conservation, NYS Department of·New York

62% match

Hudson River Estuary Round 50 Tributary Restoration and Resiliency

Closes 12/17/2026Opened 9/25/2026

City of Charlotte·North Carolina

62% match

Rocky Falls Storm Drainage Improvement Project

Rolling / TBD closeOpened 2/15/2028

U.S. Department Of The Interior·Colorado

62% match

Y--VICK 209252 Stabilize Mint Spring Bayou & VICK 310725/324137 Stabilize Terraces

Closes 3/13/2027Opened 3/13/2025

California Grants·California

62% match

Proposition 4 – River

Rolling / TBD closeOpened 6/11/2025

U.S. Department Of Defense·South Dakota

62% match

LOWER BRULE NORTH SHORELINE STABILIZATION AND ECOSYSTEM RESTORATION, ELEMENT 2

Closes 12/3/2026Opened 10/16/2026

California Grants·California

62% match

Proposition 1 Regionwide Grants

Rolling / TBD closeOpened 1/27/2025

California Grants·California

62% match

Lower American River Conservancy Program

Rolling / TBD closeOpened 6/6/2025

S7 KTR, LLC on behalf of Montgomery County Municipal Utility District No. 201·Texas

62% match

Detention Ponds and Mass Grading to Serve Longleaf Development

Closes 11/12/2026Opened 10/23/2026