The City of Santa Rosa is seeking a qualified contractor to supply, install, test, and commission a standby (emergency) generator system for the Delta Pond Pump Station, which provides reclaimed‑water pressure to the West College mainline. The scope includes a 60 kW propane‑fired generator, a 1,000‑gal propane tank, automatic transfer switch, associated electrical control room equipment, concrete pad construction, grounding, and underground fuel piping. The work must comply with California prevailing‑wage rules, BAAQMD emissions standards, NEC, IBC, and local specifications, and be completed within an 80‑working‑day construction schedule after notice to proceed.
• Supply and install a 60 kW propane standby generator with full fuel system and ATS.
• Provide electrical distribution, control panels, grounding, and conduit per NEC/IFB specifications.
• Construct concrete pads, fencing, and perform site grading, utility coordination, and required testing/commissioning.
• Deliver all required bonds, insurance, permits, and documentation; adhere to prevailing‑wage and DIR registration requirements.