Bid Banana
PricingBid helpAPILog inStart free trial
Log inStart free trial

Learn more

  • California guideCalifornia Bids and Bidding Guide
  • Pricing your bidWhy Your RFP Pricing Strategy Is Costing You
  • How to answer an IFBInvitation for Bid: You Just Received an IFB, Now What?
More civil engineering bids →Must-win bid? Bring in The Bid Lab →
Bid Banana
SearchPricingBid helpBrowse bidsAPISupportFAQPrivacy PolicyTerms of UseAI Use Policy

This website and its content is copyright of The Bid Lab © 2026. The Bid Lab is a trademark of Bid Lab, LLC. All rights reserved.

  1. Bid Banana
  2. ›Closed bids
  3. ›California
  4. ›Civil Engineering
  5. ›1MG SCLA Reclaimed Water Reservoir 2

City of Victorville·California

1MG SCLA Reclaimed Water Reservoir 2

Closes 7/9/2026$5M – $15MInvitation for Bid
Bid source

This opportunity has closed.

Bid Banana tracks 1.6M+ bids and awards across all 50 states. Save a search and we'll email your new matches, daily or weekly — so the next one reaches you with time to bid.

Get alerted next time

Description

The City of Victorville is seeking bids for the construction of a new 1-million-gallon prestressed concrete circular reclaimed water reservoir at Southern California Logistics Airport (SCLA). The project includes the design and construction of the reservoir, site preparation, excavation, foundations, underground piping connections, construction of a new pump station, and other associated work. The successful bidder will be required to provide all labor, materials, equipment, and incidentals necessary to complete the work. The project is subject to various regulations, including prevailing wage requirements and environmental compliance. Key aspects of the project include: • Construction of a 1-million-gallon prestressed concrete circular reclaimed water reservoir • Site preparation, excavation, and grading • Construction of a new pump station and associated piping • Installation of pumps, motors, valves, controls, and electrical systems • Compliance with prevailing wage requirements and environmental regulations

Attached files

The solicitation documents live at the source — open the bid source above to download them.

Contact

DENNIS LEE(Associate Civil Engineer)

[email protected]

(760) 955-2741

Key dates

Opened
4/8/2026
Questions due
6/24/2026
Pre-bid meeting
4/28/2026Mandatory
Closes
7/9/2026
Duration
350 working days

Last updated

Details

Type
Invitation for Bid
Industry
Civil Engineering
NAICS
221310
Solicitation №
MS26-111

Budget estimate

$5,000,000 – $15,000,000

Given the complexity and scope of the project, including the construction of a 1-million-gallon prestressed concrete reservoir, a new pump station, and significant site work, the budget could be substantial. The total cost will depend on various factors including labor, materials, and equipment. Considering the requirements for the project, including the need for specialized subcontractors for the reservoir design and construction, the cost could easily exceed $5 million. A reasonable estimate might place the budget between $5 million and $15 million, considering the scale of similar infrastructure projects.

AI estimate from the solicitation

Similar opportunities

Matched by Bid Banana AI™

Bid Banana · 1.6M+ bids and awards 🍌

You found this one too late. Don't find the next one too late.

Bid Banana searches open government bids across all 50 states, updated daily. Save a search once and we email you your new matches, daily or weekly, while there is still time to win them.

1.6M+
bids & awards
All 50
states
4,000+
agencies
Start your 7-day free trial

Plans from $49.99/month. Cancel anytime, no setup fees.

Built by The Bid Lab, answering RFPs since 2017.

Citrus County - Board of County Commissioners·Florida

Top match · 65%

ITB 26-196 Southwest Regional Water Reclamation Facility (SWRWRF) - Reclaimed Water System

Closes 11/24/2026Opened 10/17/2026

South Carolina Rural Water Association (SCEMD Grant)·South Carolina

63% match

Notice Of Intent To Sole Source By South Carolina Rural Water Association for Two WaterStep Water On Wheels (WOW) Cart Mobile Water Treatment Units

Rolling / TBD closeOpened 9/9/2026

California Grants·California

63% match

Proposition 1 – Water Recycling

Rolling / TBD closeOpened 6/4/2025

City of Hollywood·Florida

63% match

Water Treatment Plant MS/RO Chemical Area Recoating; Project No. 25-4262A

Closes 12/3/2026Opened 10/26/2026

California Grants·California

62% match

Proposition 68 – Water Recycling

Rolling / TBD closeOpened 6/4/2025

U.S. National Energy Technology Laboratory·United States of America

62% match

Improved Oil and Gas Recovery and Produced Water Management Technologies

Rolling / TBD closeOpened 7/6/2026

California Grants·California

62% match

Proposition 4 – Water Recycling

Closes 6/30/2030Opened 7/6/2026

U.S. Bureau of Reclamation·United States of America

62% match

Title XVI Water Reclamation and Reuse Projects

Closes 8/26/2027Opened 5/14/2026

Citrus County, Florida·Florida

61% match

ITB 26-196 Southwest Regional Water Reclamation Facility (SWRWRF) - Reclaimed Water System

Closes 11/24/2026Opened 10/17/2026

City of Green Cove Springs·Florida

61% match

DEP SRF Harbor Road WRF Expansion, Phase 3 - Reclaimed Water Ground Storage Tank

Closes 12/3/2026Opened 10/26/2026

U.S. Environmental Protection Agency·United States of America

61% match

Capital Equipment: Purchase of (1) Millipore Sigma

Closes 11/9/2026Opened 10/29/2026

California Grants·California

61% match

Underground Storage Tank Cleanup Fund

Rolling / TBD closeOpened 7/1/2021

California Grants·California

61% match

Drinking Water State Revolving Fund (DWSRF) Construction

Rolling / TBD closeOpened 8/2/2022

U.S. Department Of Defense·United States of America

61% match

Arcadia Wet Well Rehabilitation

Closes 11/9/2026Opened 10/8/2026

City of Stillwater·Oklahoma

60% match

Stillwater Regional Water Treatment Plant Solid Contact Units Rehabilitation

Closes 11/11/2026Opened 10/10/2026

Eastern Municipal Water District·California

60% match

Purified Water Replenishment SJV Advanced Water Purification Facility

Closes 11/19/2026Opened 8/25/2026

City of Duluth·Minnesota

60% match

Woodland Reservoir 2 Rehabilitation

Closes 11/17/2026Opened 10/26/2026

City of Hollywood·Florida

60% match

Water Treatment Plant Maintenance Package ‘A’; Project No. 25-4261

Closes 11/25/2026Opened 10/20/2026

U.S. Department Of Defense·United States of America

60% match

Sources Sought: Alternative Sources of Water for Small Units. (ACC-DTA CSO Amend 42)

Closes 11/6/2026Opened 10/30/2026

Alaska Department of Environmental Conservation·Alaska

60% match

Ketchikan Lakes Alternative Raw Water Supply Determination of Categorical Exclusion

Rolling / TBD closeOpened 8/11/2026

City of Neptune Beach·Florida

60% match

Water Treatment Plant Ground Storage Reservoir Rehabilitation

Closes 11/9/2026Opened 10/2/2026

California Grants·California

60% match

Drinking Water State Revolving Fund (DWSRF) Planning

Rolling / TBD closeOpened 8/1/2022

U.S. Department Of Defense·Mississippi

60% match

Arkabutla Lake Water Plant Rehab and Pre-fabricated Metal Building Installation

Closes 11/6/2026Opened 10/21/2026

Washington Suburban Sanitary Commission, MD·Maryland

60% match

Water Engineering Services (BOA)

Closes 11/18/2026Opened 10/14/2026

California Grants·California

60% match

Clean Water State Revolving Fund (CWSRF) Program

Rolling / TBD closeOpened 3/5/2025