Bid Banana
PricingBid helpAPILog inStart free trial
Log inStart free trial

Learn more

  • Tennessee guideTennessee Bids and Bidding Guide
  • Construction RFPsConstruction Bids and Bidding Guide
  • How to answer an IFBInvitation for Bid: You Just Received an IFB, Now What?
More construction bids →Must-win bid? Bring in The Bid Lab →
Bid Banana
SearchPricingBid helpBrowse bidsAPISupportFAQPrivacy PolicyTerms of UseAI Use Policy

This website and its content is copyright of The Bid Lab © 2026. The Bid Lab is a trademark of Bid Lab, LLC. All rights reserved.

  1. Bid Banana
  2. ›Closed bids
  3. ›Tennessee
  4. ›Construction
  5. ›Cedar Stone Park Phase 2A

Town of Smyrna·Tennessee

Cedar Stone Park Phase 2A

Closes 10/1/2026$500k – $3MInvitation for Bid
Bid source

This opportunity has closed.

Bid Banana tracks 1.6M+ bids and awards across all 50 states. Save a search and we'll email your new matches, daily or weekly — so the next one reaches you with time to bid.

Get alerted next time

Description

The Town of Smyrna is seeking sealed bids for the design‑build of Cedar Stone Park Phase 2A, a new youth baseball complex with associated infrastructure. The scope includes extensive site grading, installation of storm‑water management systems, utility (water, sewer, gas) installation, construction of detention ponds, erosion control, and preparation of the site for future structures such as a concessions/restroom building, maintenance facility, and asphalt parking areas. Bidders must be licensed Tennessee contractors and must obtain full contract documents prior to submitting bids. The project requires coordination with municipal utilities and adherence to local and federal civil‑rights and licensing regulations. • Mass grading of 3639 Morton Lane site and preparation for future facilities. • Installation of storm sewer, detention ponds, water, sewer, and gas utilities. • Required pre‑bid meeting (non‑mandatory) on September 22, 2026; sealed bids due October 1, 2026. • All bidders must be Tennessee‑licensed contractors; bids must include licensing details on the envelope.

Attached files

The solicitation documents live at the source — open the bid source above to download them.

Key dates

Opened
9/1/2026
Pre-bid meeting
9/22/2026
Closes
10/1/2026

Last updated

Details

Type
Invitation for Bid
Industry
Construction
NAICS
237110

Budget estimate

$500,000 – $3,000,000

The contract involves extensive earthwork, utility placement, storm‑water infrastructure, and site preparation for a multi‑field baseball complex. Based on comparable municipal park projects in Tennessee, a scope of this magnitude typically ranges from several hundred thousand to a few million dollars depending on site conditions, utility distances, and material costs. Assuming a mid‑size site with moderate grading depth and standard utility installations, a reasonable estimate would be roughly $500,000 at the low end (limited grading, minimal utility extensions) up to $3,000,000 at the high end (extensive grading, longer utility runs, and full detention‑pond construction).

AI estimate from the solicitation

Similar opportunities

Matched by Bid Banana AI™

Bid Banana · 1.6M+ bids and awards 🍌

You found this one too late. Don't find the next one too late.

Bid Banana searches open government bids across all 50 states, updated daily. Save a search once and we email you your new matches, daily or weekly, while there is still time to win them.

1.6M+
bids & awards
All 50
states
4,000+
agencies
Start your 7-day free trial

Plans from $49.99/month. Cancel anytime, no setup fees.

Built by The Bid Lab, answering RFPs since 2017.

City of Tustin·California

Top match · 66%

Tustin Legacy Linear Park - Phase 3 Between Armstrong to Warner (CIP No. 20083)

Closes 12/10/2026Opened 10/28/2026

Georgia City of Bloomingdale·Georgia

66% match

Taylor Park Improvements- Phase 1

Closes 11/30/2026Opened 10/30/2026

City of Duarte·California

66% match

Duarte Park Redevelopment: Phase II

Closes 11/23/2026Opened 10/28/2026

City of Lake Charles·Louisiana

66% match

Riverside Park Shoreline Protection – Phase One

Closes 11/17/2026Opened 10/22/2026

Town of Hilton Head Island·South Carolina

65% match

Crossings Park Improvements Phase 2-Skate Park and Pump Track

Closes 12/10/2026Opened 10/26/2026

City of Key West·Florida

65% match

Bayview Park Phase 2

Closes 11/9/2026Opened 9/24/2026

Pierce County·Washington

64% match

Orangegate Park Phase 1 Site Improvements

Closes 11/10/2026Opened 10/7/2026

City of Goose Creek·South Carolina

63% match

Creekside Park Renovations

Closes 11/30/2026Opened 10/30/2026

City of Gainesville - Procurement Division·Florida

63% match

Sweetwater Recreational Trail Phase 2 (Sweetwater Wetlands Park to Sweetwater Preserve)

Closes 11/12/2026Opened 10/14/2026

Georgia City of Bloomingdale·Georgia

63% match

Taylor Park Improvements- Phase 2

Closes 11/30/2026Opened 10/30/2026

Camden County·New Jersey

63% match

Newton Lake Park & Cooper River Park Path Improvements Project

Closes 11/18/2026Opened 9/10/2026

City of Lowell·Massachusetts

62% match

Saint Louis Park Phase 2, addenda 3 issued

Closes 11/4/2026Opened 10/7/2026

City of Redding·California

62% match

STILLWATER BUSINESS PARK PROJECT – PHASE 2A - TREE REMOVAL

Closes 11/5/2026Opened 10/20/2026

Maryland Department of Natural Resources·Maryland

62% match

Trail Ph 2 - Construction at Gathland State Park

Closes 11/3/2026Opened 10/9/2026

City of Bellevue·Washington

62% match

Meydenbauer Bay Park Phase 2 - GC/CM Services

Closes 12/4/2026Opened 10/22/2026

City of Fremont·Ohio

62% match

Birchard Park Phase I

Rolling / TBD closeOpened 10/21/2026

Department of Parks, Recreation and Tourism·South Carolina

61% match

Golf Course Cart Path Paving-Hickory Knob State Resort Park

Closes 11/11/2026Opened 10/14/2026

Alaska Department of Transportation & Public Facilities·Alaska

61% match

RTP Grant Application - Wil Maamxsga Pts'aan Park Phase III

Rolling / TBD closeOpened 9/24/2026

City of Shawnee·Kansas

61% match

Ordinance No. 3522

Closes 6/3/2033Opened 6/3/2025

City of Austin·Texas

61% match

John Trevino Jr. Metro Park - Phase I Development

Rolling / TBD closeOpened 10/19/2026

City of Pueblo·Colorado

61% match

Concrete Improvements - Elmwood Golf Course Cart Paths Phase 2

Closes 11/17/2026Opened 10/27/2026

City of Creve Coeur·Missouri

61% match

Malcolm Terrace Park Bridge and Deer Creek Stabilization

Closes 11/12/2026Opened 10/22/2026

City of Keene·New Hampshire

61% match

THT Phase#2, NHDOT#45251 Design Project

Closes 11/19/2026Opened 10/9/2026

U.S. Department Of Defense·South Dakota

61% match

LOWER BRULE NORTH SHORELINE STABILIZATION AND ECOSYSTEM RESTORATION, ELEMENT 2

Closes 12/3/2026Opened 10/16/2026

City of Kingsport·Tennessee

61% match

Kingsport Bike Park Phase III

Closes 11/3/2026Opened 10/10/2026