The Northern Virginia Regional Park Authority (NOVA Parks) is soliciting a qualified contractor to completely renovate the existing pool at Volcano Island Water Park in Sterling, VA. The work includes selective demolition, concrete pool shell modifications, new plaster finish, installation of a Multi‑Level Pool System (MLPS), associated mechanical and electrical systems, and the integration of modular water‑play structures and slides. The contractor must hold a Virginia Contractor’s License, provide required bid and performance bonds, and adhere to a construction schedule that begins mid‑September 2026 and reaches substantial completion by early May 2027.
• Demolition of existing pool structures, MLPS equipment, and partial deck, with temporary protection and erosion control.
• Structural modifications, concrete work, new pool finish, and full MLPS installation including plumbing, electrical, controls, and testing.
• Installation of modular water‑play equipment, site restoration, training for NOVA staff, and delivery of close‑out documentation (as‑built drawings, warranties, manuals).
You found this one too late. Don't find the next one too late.
Bid Banana searches open government bids across all 50 states, updated daily. Save a search once and we email you your new matches, daily or weekly, while there is still time to win them.