Bid Banana
PricingBid helpAPILog inStart free trial
Log inStart free trial

Learn more

  • California guideCalifornia Bids and Bidding Guide
  • Compliance checkHow to Ensure RFP Compliance
  • How to answer an RFPChoosing and Responding to Government Bids
More environmental services bids →Must-win bid? Bring in The Bid Lab →
Bid Banana
SearchPricingBid helpBrowse bidsAPISupportFAQPrivacy PolicyTerms of UseAI Use Policy

This website and its content is copyright of The Bid Lab © 2026. The Bid Lab is a trademark of Bid Lab, LLC. All rights reserved.

  1. Bid Banana
  2. ›Closed bids
  3. ›California
  4. ›Environmental Services
  5. ›Feasibility Study within the Yolo Bypass,

California Department of Water Resources·California

Feasibility Study within the Yolo Bypass,

Closes 7/22/2026$120k – $200kRequest for Proposal
Bid source

This opportunity has closed.

Bid Banana tracks 1.6M+ bids and awards across all 50 states. Save a search and we'll email your new matches, daily or weekly — so the next one reaches you with time to bid.

Get alerted next time

Description

The California Department of Water Resources is seeking a qualified contractor to conduct a comprehensive feasibility study for potential habitat projects within the Yolo Bypass (lower Sacramento River Basin). The work includes environmental and engineering surveys, development of alternative project analyses, preliminary design phases, and the delivery of a final feasibility study report. The contract is anticipated to run for up to four years, beginning in April 2026, with multiple milestone deliverables ranging from survey reports (by Oct 2026) to final study completion (Jan 2029). • Conduct surveys (cultural, wildlife, geotechnical, hydrodynamic) and produce reports by Oct 2026. • Develop at least three alternatives, including “no‑action,” with cost estimates, technical memos, and outreach materials through Nov 2027. • Deliver staged preliminary design documents (10 % LOD, 35 % LOD, Basis‑of‑Design) and a final feasibility study by Jan 2029. • Provide ongoing contract administration, invoicing, and compliance with mandatory certifications (DVBE, GenAI disclosure, etc.).

Attached files

Contact

Nita Khushal(Supervisor I, Division of Business Services, Contract Services)

[email protected]

(916) 820‑7678

Key dates

Opened
11/26/2025
Questions due
12/2/2025
Closes
7/22/2026
Duration
4 years

Last updated

Details

Type
Request for Proposal
Industry
Environmental Services
NAICS
541620
Solicitation №
10214089

Budget estimate

$120,000 – $200,000

The solicitation does not disclose a fixed contract value, but the RFP summary references example cost ranges of $100 k–$175 k for comparable studies. Considering the four‑year duration, required specialized surveys, multiple design phases, and mandatory certifications, a realistic contract award could fall between $120,000 and $200,000. Factors influencing the final amount include the depth of field work, number of subcontractors, and any supplemental scope additions.

AI estimate from the solicitation

Similar opportunities

Matched by Bid Banana AI™

Bid Banana · 1.6M+ bids and awards 🍌

You found this one too late. Don't find the next one too late.

Bid Banana searches open government bids across all 50 states, updated daily. Save a search once and we email you your new matches, daily or weekly, while there is still time to win them.

1.6M+
bids & awards
All 50
states
4,000+
agencies
Start your 7-day free trial

Plans from $49.99/month. Cancel anytime, no setup fees.

Built by The Bid Lab, answering RFPs since 2017.

Delaware Valley Regional Planning Commission·Pennsylvania

Top match · 68%

Feasibility Study for Naylor's Run and Pennsy Trails (TCDI Project Category 5 – Transportation and Infrastructure Planning)

Closes 11/13/2026Opened 10/5/2026

Delaware Valley Regional Planning Commission·Pennsylvania

68% match

Schuylkill River Pedestrian and Cyclist Bridge Feasibility Study (TCDI Project Category 5 – Transportation and Infrastructure Planning)

Closes 12/4/2026Opened 10/30/2026

City of Fairfax·Virginia

67% match

Concept Feasibility Study, Fairfax Circle

Closes 11/12/2026Opened 10/9/2026

City of Rogers·Arkansas

66% match

Request for Letters of Interest – US‑71B Corridor Study & Railyard Loop Trail Undercrossing Feasibility Studies

Closes 11/3/2026Opened 10/11/2026

City of Lancaster·Texas

66% match

Truck Route Study

Closes 11/18/2026Opened 10/14/2026

City of Rogers·Arkansas

66% match

SS4A US-71B Corridor Study and Railyard Loop Trail Undercrossing Feasibility Studies Request for Letters of Interest

Closes 11/3/2026Opened 10/11/2026

City of Lancaster·Texas

65% match

Truck Route Study

Closes 11/18/2026Opened 10/14/2026

City of Corning·California

65% match

Yolo Street Rehabilitation Project

Closes 11/4/2026Opened 9/23/2026

City of Lancaster·Texas

65% match

Truck Route Study

Closes 11/18/2026Opened 10/14/2026

Houston-Galveston Area Council·Texas

64% match

Sienna Area Corridor Plan

Closes 12/11/2026Opened 10/29/2026

City of Pasadena·California

64% match

El Molino Avenue Demonstration Project

Closes 11/6/2026Opened 10/7/2026

U.S. National Institutes of Health·United States of America

63% match

Feasibility Studies to Inform the Design of Future Clinical Trials

Closes 2/15/2027Opened 4/28/2026

Houston-Galveston Area Council·Texas

63% match

Freight Grade Separation Planning Studies Program Services

Closes 12/10/2026Opened 10/21/2026

City of Elizabeth·New Jersey

63% match

Feasibility Study for Ferry Service Consultant Inquiries and the Citys Responses.pdf

Rolling / TBD closeOpened 3/24/2026

County of Westchester·New York

63% match

REQUEST FOR PROPOSAL : Microtransit Services (Peekskill)

Closes 12/2/2026Opened 9/12/2026

Oregon Health and Science University·Oregon

63% match

Feasibility Study of Owner Controlled Insurance Program or Rolling Owner Controlled Insurance Program

Rolling / TBD closeOpened 10/8/2021

Town and County of Nantucket·Massachusetts

63% match

Cellular Service Site Assessment and Feasibility Study

Closes 11/4/2026Opened 10/9/2026

City of Corona·California

63% match

Microgrid Feasibility Study-Lester Water Treatment Plant and Chase Booster Station

Closes 11/23/2026Opened 10/22/2026

Texas Houston-Galveston Area Council·Texas

62% match

Freight Grade Separation Planning Studies Program Services

Closes 12/10/2026Opened 10/21/2026

Texas Houston-Galveston Area Council·Texas

62% match

Sienna Area Corridor Plan

Closes 12/11/2026Opened 10/29/2026

NYS Capital Region Transportation Council·New York

62% match

Town of Stillwater County Route 76 Corridor Study

Closes 11/27/2026Opened 10/26/2026