The project calls for a complete interior fit‑out of the second floor of the Dauphin Island Sea Lab dormitory, delivering 18 new residential units and associated interior finishes. The scope includes demolition, interior framing, installation of steel interior doors and frames, PoE‑enabled door hardware, luxury‑vinyl tile flooring, mechanical and electrical rough‑ins, fire‑sprinkler modifications, and final finishes such as cabinetry, fixtures, and millwork. The contract is a sealed‑bid, fixed‑price construction effort with a 136‑day construction schedule and mandatory pre‑bid conference.
• Interior renovation of ~15,230 sq ft covering 18 dwelling units.
• Requires specialized door hardware (PoE‑enabled locks, electrified hinges) and specific flooring systems (Tarkett LVT).
• Includes mechanical, electrical, plumbing, fire‑protection, and finish‑work coordination under strict DCM and NFPA standards.
• Contractor must manage site access without using the building’s elevator, using exterior stairs and a removable window for material handling.
• All bids must be submitted by September 1 2026, with a mandatory pre‑bid meeting on August 18 2026.