The 126th Air Refueling Wing at Scott Air Force Base, Illinois, seeks a qualified contractor to perform comprehensive repairs to the airfield’s concrete apron, asphalt shoulders, and associated markings. The effort includes joint sealant, crack and spall repair, milling and overlay of approximately 14,500 square yards of asphalt shoulder, removal and replacement of roughly 35,000 linear feet of airfield markings, and minor asphalt road repairs. Work must comply with Air Force and FAA standards, be performed under prevailing‑wage rules, and be completed within a 90‑day performance period. Vendors must submit a detailed technical narrative, pricing sheet, supervisor résumé, and schedule via email; a site visit is scheduled for 9 Sep 2026 (attendance optional but beneficial). The contract value is estimated between $1 M and $2 M.
• Scope: Concrete apron joint sealant, crack & spall repair; asphalt shoulder mill & overlay (~14,500 SY); airfield marking removal & replacement (~35,000 LF); small asphalt road repair (550 SF).
• Performance period: 90 days from contract award.
• Mandatory requirements: Prevailing‑wage compliance, security clearances, AT Level I training for personnel.
• Submission: Email quote to
[email protected] with required attachments; no bid bond required.
• Evaluation factors: Technical capability/experience, past performance, price (technical and past performance weighted equally).
• Site visit: 9 Sep 2026, 0900 CT, 126th CES Classroom, Bldg 5002 (RSVP by 7 Sep 2026).