The University of California, Los Angeles is seeking a qualified subcontractor to perform cold‑formed metal framing, drywall, acoustic ceiling tile installation, insulation, pipe‑grid, fire‑stopping, and associated demolition/finish work for the Acosta Operations Center renovation. The scope covers roughly 2,738 gsf of ground‑floor space, includes LEED‑ID+C compliance, and must meet California prevailing‑wage and licensing requirements. The budget for this package is $480,221 and the bid process includes a pre‑bid conference, a site walk, and multiple bid submission windows. Only six pre‑qualified firms may submit.
• Scope: metal stud framing, gypsum board, acoustic ceilings, insulation, studio pipe‑grid, fire‑stop, demolition, interior finish work.
• Key dates: Docs released 9/2/26, pre‑bid conference 9/8/26, site walk 9/9/26, RFIs due 9/15/26, bids due 10/6‑19/26.
• Requirements: CA B‑License, UC Fair Wage, LEED‑ID+C, only listed pre‑qualified bidders eligible.