The City of West Sacramento is seeking a qualified contractor to install a durable resin‑based flooring system in the apparatus bay of Fire Station 43. The work includes full surface preparation, concrete repair, application of a cementitious urethane mortar base, pigmented broadcast, and a UV‑stable urethane topcoat with non‑skid aggregate, plus approximately 250 LF of safety striping. The contractor must verify existing conditions, protect fire apparatus, coordinate with city staff, and complete the job within two weeks, complying with prevailing‑wage and licensing requirements.
• Location: Fire Station 43, 1561 Harbor Blvd., West Sacramento, CA 95691
• Scope: surface prep, joint/crack treatment, concrete repair, resinous flooring system (≈2,506 SF), safety striping (≈250 LF)
• Materials: Sherwin‑Williams Poly‑Crete SL system (or approved equal)
• Schedule: Pre‑bid meeting 9/25/2026 (mandatory); questions due 10/2/2026; bid due 10/9/2026 2 pm; award 10/16/2026; work to be finished within 2 weeks of start
• Requirements: CSLB license, prevailing‑wage compliance, insurance, 5 yr experience with similar systems, 3 references, use of City’s Virtual Project Manager system
• Evaluation: Lowest responsive, responsible bid