The City of Fayetteville is seeking a qualified general contractor to renovate a third‑floor storage room in City Hall into three private offices and an adjoining corridor, completing all architectural, mechanical, electrical, IT/data, fire‑sprinkler, and life‑safety work to meet current codes and city standards. The scope includes demolition, new metal‑stud framing, Level‑4 gypsum finishes, commercial‑grade flooring, doors, lighting, power, data, HVAC modifications, fire‑alarm and sprinkler system updates (including a $10,000 allowance), and full close‑out documentation. The contract is firm‑price, sealed‑bid, with a 60‑day performance period after award.
• Convert existing storage space into three equal offices + corridor (full interior finish).
• Provide complete MEP, IT, fire‑sprinkler, and life‑safety systems upgrades to comply with 2018 NC Building Code and ADA.
• Deliver as‑built drawings, warranties, O&M manuals, and a one‑year correction period after substantial completion.