The Dexter Community Schools is seeking a proposal for the construction of a field house at Dexter High School. The field house will require a foundation design that can support various loads, including dead loads, live loads, collateral loads, and seismic loads. The proposal should include a design that meets the applicable code for ASD design and includes magnification factors for seismic loads. The field house will have a mezzanine with a dead load of 33 kips and a live load of 66 kips. The partition load is 6 kips and the collateral load is 7 kips. The field house will also be subject to wind loads and seismic loads. The proposal should include a detailed design and calculations for the foundation and superstructure of the field house.
Some key features of the project include:
• A foundation design that can support various loads
• A mezzanine with a dead load of 33 kips and a live load of 66 kips
• A partition load of 6 kips and a collateral load of 7 kips
• Wind loads and seismic loads
• A detailed design and calculations for the foundation and superstructure
You found this one too late. Don't find the next one too late.
Bid Banana searches open government bids across all 50 states, updated daily. Save a search once and we email you your new matches, daily or weekly, while there is still time to win them.