Bid Banana
PricingBid helpAPILog inStart free trial
Log inStart free trial

Learn more

  • South Carolina guideSouth Carolina Bids and Bidding Guide
  • Construction RFPsConstruction Bids and Bidding Guide
  • How to answer an IFBInvitation for Bid: You Just Received an IFB, Now What?
More construction bids →Must-win bid? Bring in The Bid Lab →
Bid Banana
SearchPricingBid helpBrowse bidsAPISupportFAQPrivacy PolicyTerms of UseAI Use Policy

This website and its content is copyright of The Bid Lab © 2026. The Bid Lab is a trademark of Bid Lab, LLC. All rights reserved.

  1. Bid Banana
  2. ›Closed bids
  3. ›South Carolina
  4. ›Construction
  5. ›Lower Reedy WRRF Streambank Stabilization RFB

Renewable Water Resources (ReWa)·South Carolina

Lower Reedy WRRF Streambank Stabilization RFB

Closes 9/1/2026$200k – $500kInvitation for Bid
Bid source

This opportunity has closed.

Bid Banana tracks 1.6M+ bids and awards across all 50 states. Save a search and we'll email your new matches, daily or weekly — so the next one reaches you with time to bid.

Get alerted next time

Description

The Renewable Water Resources (ReWa) agency is soliciting bids for the Lower Reedy Water‑Waste‑Reclamation‑Facility (WRRF) Streambank Stabilization project. The work focuses on restoring an eroded streambank adjacent to existing sanitary sewer infrastructure along the Reedy River in Greenville, SC. Contractors will be responsible for removal of existing structures and debris, installing a 194‑ft boulder toe wall, two in‑stream boulder vanes, grading, restoring the washed‑out bank, and implementing sediment and erosion control measures. • Remove existing structures and debris from the targeted streambank area. • Install approximately 194 linear feet of boulder toe wall and two in‑stream boulder vanes. • Perform grading, bank restoration, and install erosion‑control and sediment‑control measures. • Ensure work complies with local environmental and sanitary sewer regulations. • Provide all labor, equipment, materials, and site supervision needed to complete the scope.

Attached files

The solicitation documents live at the source — open the bid source above to download them.

Contact

Stephanie Selman(Agency Project Coordinator)

[email protected]

(864) 299‑4000

Key dates

Opened
8/5/2026
Closes
9/1/2026

Last updated

Details

Type
Invitation for Bid
Industry
Construction
NAICS
237990
Solicitation №
597

Budget estimate

$200,000 – $500,000

The project involves 194 ft of boulder toe wall, two in‑stream boulder vanes, grading, bank restoration, and erosion‑control measures. Assuming boulder wall installation costs roughly $500–$800 per linear foot (including material, labor, and equipment), the toe wall alone could be $97,000–$155,000. Adding vanes, grading, sediment control, and mobilization could raise total costs to a range of $200,000 to $500,000. This estimate accounts for regional labor rates in South Carolina, the need for specialized handling of heavy boulders, and environmental compliance requirements.

AI estimate from the solicitation

Similar opportunities

Matched by Bid Banana AI™

Bid Banana · 1.6M+ bids and awards 🍌

You found this one too late. Don't find the next one too late.

Bid Banana searches open government bids across all 50 states, updated daily. Save a search once and we email you your new matches, daily or weekly, while there is still time to win them.

1.6M+
bids & awards
All 50
states
4,000+
agencies
Start your 7-day free trial

Plans from $49.99/month. Cancel anytime, no setup fees.

Built by The Bid Lab, answering RFPs since 2017.

California Grants·California

Top match · 66%

Stream Flow Enhancement

Rolling / TBD closeOpened 6/6/2025

St. Louis County, MN - Purchasing Division·Minnesota

65% match

Stream Mitigation Bank Development

Closes 11/9/2026Opened 10/19/2026

City of Anderson·South Carolina

65% match

Branchcliff Lane Streambank Stabilization

Closes 11/2/2026Opened 10/12/2026

City of Fitchburg·Wisconsin

63% match

Yarmouth Greenway Streambank Restoration

Closes 11/10/2026Opened 10/29/2026

U.S. Department Of Defense·South Dakota

62% match

LOWER BRULE NORTH SHORELINE STABILIZATION AND ECOSYSTEM RESTORATION, ELEMENT 2

Closes 12/3/2026Opened 10/16/2026

California Grants·California

61% match

RMC Lower LA River Grant Program

Rolling / TBD closeOpened 11/19/2024

California Grants·California

61% match

Urban Streams Restoration Program

Rolling / TBD closeOpened 10/1/2026

Washakie County Conservation District·Wyoming

60% match

Big Horn River Bank Stabilization Project

Closes 12/1/2026Opened 10/29/2026

North Carolina Department of Environmental Quality·North Carolina

60% match

RFP16-2393983869 White Oak 03030001 2026 Stream, Riparian and Non-Riparian Wetland Compensatory Mitigation Full Delivery Projects

Closes 2/23/2027Opened 10/21/2026

California Grants·California

60% match

Proposition 1 Lower Los Angeles River Grants

Rolling / TBD closeOpened 1/27/2025

U.S. Natural Resources Conservation Service·United States of America

60% match

Easement Restoration and Stewardship

Closes 11/19/2026Opened 9/25/2026

California Grants·California

59% match

Watershed Resilience Conservation Implementation

Rolling / TBD closeOpened 8/4/2026

California Grants·California

59% match

Lower American River Conservancy Program

Rolling / TBD closeOpened 6/6/2025

City of Charlotte·North Carolina

59% match

Newell Stream Restoration Project

Rolling / TBD closeOpened 7/15/2026

North Carolina County of Mecklenburg·North Carolina

59% match

Kings Branch at Arrowood Road Phase 2B Stream Restoration

Closes 11/5/2026Opened 10/9/2026

New York City Department of Environmental Protection·New York

58% match

82627B0022-BEDC-NR-107 Structural improvements to the North River WRRF

Closes 12/9/2026Opened 10/22/2026

Oregon EWEB·Oregon

58% match

EWEB RFP #26-171-PSC Carmen-Smith Mitigation Fund Administrator

Closes 11/2/2026Opened 10/2/2026

U.S. Department Of The Interior·Colorado

58% match

Y--VICK 209252 Stabilize Mint Spring Bayou & VICK 310725/324137 Stabilize Terraces

Closes 3/13/2027Opened 3/13/2025

U.S. Department Of Defense·Nebraska

58% match

LOWER BRULE NORTH SHORELINE STABILIZATION AND ECOSYSTEM RESTORATION, ELEMENT 2

Closes 9/22/2027Opened 9/22/2026

California Grants·California

58% match

Riparian Habitat Conservation

Rolling / TBD closeOpened 6/6/2025

City of Lynchburg·Virginia

58% match

IFB 2027-027 CSO 70 SEWER IMPROVEMENTS

Closes 12/8/2026Opened 10/21/2026

California Department of Parks and Recreation·California

58% match

RFP # C26708001: Aquatic Vegetation Control (Reposted)

Closes 11/24/2026Opened 10/15/2026

California Grants·California

58% match

Proposition 68 Rivers and Streams Grant Program

Rolling / TBD closeOpened 6/18/2025

California Grants·California

58% match

Wildlife Corridor and Fish Passage

Rolling / TBD closeOpened 6/18/2025

California Department of Water Resources·California

58% match

Real-Time River Forecasting System

Closes 11/23/2026Opened 10/19/2026