Bid Banana
PricingBid helpAPILog inStart free trial
Log inStart free trial

Learn more

  • Federal contracts (SAM.gov)The Ultimate Guide to SAM.gov Registration
  • Construction RFPsConstruction Bids and Bidding Guide
  • How to answer an RFIRFI Meaning: What Is an RFI?
More construction bids →Must-win bid? Bring in The Bid Lab →
Bid Banana
SearchPricingBid helpBrowse bidsAPISupportFAQPrivacy PolicyTerms of UseAI Use Policy

This website and its content is copyright of The Bid Lab © 2026. The Bid Lab is a trademark of Bid Lab, LLC. All rights reserved.

  1. Bid Banana
  2. ›Closed bids
  3. ›Federal
  4. ›Repair and Maintain Water Towers at FCI Terre Haute

U.S. Department Of Justice·Texas

Repair and Maintain Water Towers at FCI Terre Haute

Closes 8/4/2026$500k – $1MRequest for Information
Bid source

This opportunity has closed.

Bid Banana tracks 1.6M+ bids and awards across all 50 states. Save a search and we'll email your new matches, daily or weekly — so the next one reaches you with time to bid.

Get alerted next time

Description

The Federal Bureau of Prisons (FBOP) is seeking small business contractors to repair and maintain two water towers at the Federal Correctional Institution (FCI) Terre Haute. The project includes tasks such as exterior preparation, exterior coating, dry interior remediation, and foundation maintenance. The contractor will be required to provide all necessary equipment, labor, materials, and incidentals for the project. The estimated magnitude of the project lies between $500,000 and $1,000,000. • The project requires professional maintenance, repair, and safety upgrades for the two institution-critical elevated water storage tanks. • The contractor must be registered in the System for Award Management (SAM) and have a unique entity identifier (UEI). • The contractor must be capable of performing the work required and have the necessary resources and expertise. • The project has a performance period of 287 calendar days. • The contractor will be required to provide a comprehensive 100% design package for FBOP approval.

Attached files

Contact

Kevin Slone

[email protected]

(202) 578-8617

Key dates

Opened
7/28/2026
Closes
8/4/2026
Duration
287 days

Last updated

Details

Type
Request for Information
Industry
Construction
NAICS
237110
Solicitation №
15B41826PR000600

Budget estimate

$500,000 – $1,000,000

Based on the document, the estimated magnitude of the project lies between $500,000 and $1,000,000. The budget amount will likely be within this range, considering the scope of work and the required tasks. Factors that may influence the likely payment range include the complexity of the project, the materials and equipment required, and the labor costs. The estimated budget amount is likely to be around $750,000, considering the midpoint of the estimated magnitude range.

AI estimate from the solicitation

Similar opportunities

Matched by Bid Banana AI™

Bid Banana · 1.6M+ bids and awards 🍌

You found this one too late. Don't find the next one too late.

Bid Banana searches open government bids across all 50 states, updated daily. Save a search once and we email you your new matches, daily or weekly, while there is still time to win them.

1.6M+
bids & awards
All 50
states
4,000+
agencies
Start your 7-day free trial

Plans from $49.99/month. Cancel anytime, no setup fees.

Built by The Bid Lab, answering RFPs since 2017.

City of Lime Springs·Iowa

Top match · 68%

Lime Springs, City of 100,000 Gallon Elevated Tower Reconditioning 26X.143612

Closes 11/19/2026Opened 10/29/2026

City of Eau Claire·Wisconsin

67% match

Cleaning, Repairing, & Painting of Folsom Water Tower

Closes 12/3/2026Opened 10/26/2026

City of Chicago·Illinois

67% match

Eugene Sawyer Water Purification Plant (ESWPP) Low Lift Pump Building, Chemical Building, and Garage Roof Replacement

Closes 12/18/2026Opened 10/12/2026

Medina County, OH Sanitary Engineering·Ohio

67% match

Chatham Water Tower Rehabilitation 2027

Closes 11/6/2026Opened 10/16/2026

Chennault International Airport Authority·Louisiana

66% match

Firewater Pumphouse #2 (FWPH) Firewater Storage Tanks 1 & 2 Repairs, Recoat, and Controls Upgrade (Project #2026-03)

Closes 11/17/2026Opened 10/13/2026

City of Indianapolis·Indiana

66% match

Pool Water Maintenance Services

Closes 11/5/2026Opened 10/16/2026

U.S. Department Of Justice·Illinois

65% match

Replace Water Tanks FCI Marion Marions, Illinois

Closes 11/30/2026Opened 10/29/2026

Indiana Environmental Management·Indiana

65% match

Tower Relocation

Closes 11/12/2026Opened 10/9/2026

City of Bedford, TX·Texas

65% match

Water Meter Installations

Closes 11/12/2026Opened 10/9/2026

City of South Hutchinson·Kansas

65% match

2025 Water Tower Improvements for the City of South Hutchinson

Closes 11/18/2026Opened 10/28/2026

U.S. Department Of Justice·Illinois

65% match

FCI Marion - Emergency Repair Tornado Damage

Closes 12/3/2026Opened 10/5/2026

New York City Department of Design and Construction·New York

65% match

Emergency Water Main Work

Rolling / TBD closeOpened 4/24/2025

City of Worcester·Massachusetts

64% match

Waterproofing & Repairs – Union Station Garage / DPF-FTA

Closes 11/4/2026Opened 10/1/2026

City of Colorado Springs·Colorado

64% match

Parks On-Call Irrigation Repairs

Closes 12/2/2026Opened 10/27/2026

U.S. Department Of Health And Human Services·California

64% match

Cooling Tower Refurbishment - Three (3) Cells

Closes 11/2/2026Opened 10/26/2026

U.S. Department Of Defense·United States of America

64% match

USFK C4I Communication Tower and Facility Maintenance CY27

Closes 11/17/2026Opened 10/19/2026

Southwest Regional Water District·Iowa

64% match

F Ave. 10" Waterline Improvements, Southwest Regional Water District - Clarinda, Iowa

Closes 11/2/2026Opened 9/22/2026

City of Bellevue·Washington

64% match

2027 Phase 1 Water Main Replacement

Closes 11/12/2026Opened 10/22/2026

Fort Pierce Utilities Authority·Florida

64% match

Water & Wastewater Systems Continuing Design-Build Services

Closes 11/2/2026Opened 10/6/2026

Public Water Supply District No. 2 of St. Charles County·Missouri

64% match

Western Transmission Main Phase 4C

Closes 11/19/2026Opened 10/9/2026

U.S. Department Of Defense·Kentucky

64% match

Fishtrap Lake Intake Structure and Dam Rehabilitation; W91237-26-R-A020

Closes 11/6/2026Opened 10/9/2026

City of Mobile·Alabama

64% match

Critical Repair - 1523 Airview Dr. - Roof Replacement

Closes 11/10/2026Opened 10/28/2026

Northern Kentucky Water District·Kentucky

64% match

Roof Replacement for Fort Thomas Treatment Plant Chemical Building

Closes 12/4/2026Opened 10/30/2026

County of Hernando·Florida

64% match

Hernando Beach Water Tower Maintenance

Closes 11/16/2026Opened 9/30/2026

City of Canton·Georgia

64% match

Professional Emergency Repair Services for On-Call Water, Sanitary Sewer, and Stormwater

Closes 12/11/2026Opened 10/29/2026