Bid Banana
PricingBid helpAPILog inStart free trial
Log inStart free trial

Learn more

  • Florida guideFlorida Bids and Bidding Guide
  • Construction RFPsConstruction Bids and Bidding Guide
  • How to answer an IFBInvitation for Bid: You Just Received an IFB, Now What?
More construction bids →Must-win bid? Bring in The Bid Lab →
Bid Banana
SearchPricingBid helpBrowse bidsAPISupportFAQPrivacy PolicyTerms of UseAI Use Policy

This website and its content is copyright of The Bid Lab © 2026. The Bid Lab is a trademark of Bid Lab, LLC. All rights reserved.

  1. Bid Banana
  2. ›Closed bids
  3. ›Florida
  4. ›Construction
  5. ›Bid 2526-12 Water Treatment Plant No. 3 Chlorination Upgrade

City of Atlantic Beach·Florida

Bid 2526-12 Water Treatment Plant No. 3 Chlorination Upgrade

Closes 4/22/2026$500k – $1MInvitation for Bid
Bid source

This opportunity has closed.

Bid Banana tracks 1.6M+ bids and awards across all 50 states. Save a search and we'll email your new matches, daily or weekly — so the next one reaches you with time to bid.

Get alerted next time

Description

The City of Atlantic Beach is seeking bids for the Water Treatment Plant No. 3 Chlorination Upgrade project. The project involves demolition and removal of the existing gas chlorine tanks and equipment, and furnishing and replacing with two new 500-gallon storage tanks and other necessary equipment. The project must be completed in accordance with the bid specifications and contract documents. • The project includes demolition and removal of existing equipment • The project includes furnishing and replacing with two new 500-gallon storage tanks • The project must be completed in accordance with the bid specifications and contract documents • Bidders must visit the City's website at www.coab.us/bids for complete specifications and details

Attached files

The solicitation documents live at the source — open the bid source above to download them.

Contact

Patty Drake(Procurement Manager)

[email protected]

Key dates

Opened
3/30/2026
Closes
4/22/2026

Last updated

Details

Type
Invitation for Bid
Industry
Construction
NAICS
237110
Solicitation №
ITB-Bid 2526-12-0-2026/PD

Budget estimate

$500,000 – $1,000,000

The budget for this project is estimated to be around $500,000 to $1,000,000, based on the scope of work and the equipment required. The project involves the demolition and removal of existing equipment, and the furnishing and replacement of two new 500-gallon storage tanks, which could be a significant cost. Additionally, the project must be completed in accordance with the bid specifications and contract documents, which could also impact the cost. However, without a specified budget or cost estimate, this is a rough estimate.

AI estimate from the solicitation

Similar opportunities

Matched by Bid Banana AI™

Bid Banana · 1.6M+ bids and awards 🍌

You found this one too late. Don't find the next one too late.

Bid Banana searches open government bids across all 50 states, updated daily. Save a search once and we email you your new matches, daily or weekly, while there is still time to win them.

1.6M+
bids & awards
All 50
states
4,000+
agencies
Start your 7-day free trial

Plans from $49.99/month. Cancel anytime, no setup fees.

Built by The Bid Lab, answering RFPs since 2017.

City of Kyle·Texas

Top match · 75%

Yarrington Water Treatment Plant Disinfection Modification

Closes 12/1/2026Opened 10/26/2026

City of Long Prairie·Minnesota

75% match

Long Prairie, City of Water Treatment Plant Rehabilitation 25X.138024

Closes 11/18/2026Opened 10/29/2026

Oregon Clackamas County·Oregon

75% match

BID 2026-78 Tri-City Water Resource Recovery Facility (WRRF) Aeration Basin Improvements

Closes 11/17/2026Opened 10/7/2026

New York City Department of Environmental Protection·New York

75% match

82627B0004-BEDC OB-144A Total Residual Chlorine Optimization Oakwood Beach WRRF

Closes 11/25/2026Opened 10/7/2026

New York City Department of Environmental Protection·New York

74% match

82627B0004-BEDC OB-144A: Total Residual Chlorine (TRC) Optimization at the Oakwood Beach Wastewater Resource Recovery Facility (WRRF)

Closes 11/18/2026Opened 10/7/2026

Oregon City of Ashland·Oregon

74% match

Ashland Water Treatment Plant

Closes 11/5/2026Opened 9/29/2026

City of Hollywood·Florida

74% match

Water Treatment Plant Maintenance Package ‘A’; Project No. 25-4261

Closes 11/25/2026Opened 10/20/2026

City of Asheville·North Carolina

73% match

Request for Formal Bids for DeBruhl Water Treatment Plant Bulk Chemical Storage Replacement

Closes 12/10/2026Opened 10/29/2026

LA Water & Power·California

73% match

146409 WATER SOFTENER SYSTEM - RINALDI TOLUCA Chlorination Station

Closes 11/13/2026Opened 9/23/2026

City of Redlands·California

73% match

REDLANDS WASTEWATER TREATMENT PLANT UPGRADES - PHASE 2 - REBID

Closes 11/12/2026Opened 9/30/2026

City of Wilmington·Delaware

73% match

25035PW-R – Porter Water Filter Plant Electrical Upgrade Project

Closes 11/3/2026Opened 10/8/2026

City of Hollywood·Florida

73% match

Water Treatment Plant MS/RO Chemical Area Recoating; Project No. 25-4262A

Closes 12/3/2026Opened 10/26/2026

Contra Costa Water District·California

73% match

Bollman Water Treatment Plant Improvements

Closes 12/10/2026Opened 10/29/2026

City of Charlotte·North Carolina

73% match

McDowell Creek Wastewater Treatment Plant Clarifier & Pumping Station

Rolling / TBD closeOpened 1/1/2027

City of High Point·North Carolina

72% match

Bid 08-120226 - Riverdale Pump Station Improvements

Closes 12/2/2026Opened 10/20/2026

Riverton City·Utah

72% match

CC26-475 Main Water Tank Drainline Upgrade Project

Closes 11/17/2026Opened 10/30/2026

The Metropolitan Water District of Southern California·California

72% match

Joseph P. Jensen Water Treatment Plant Infrastructure and Security Improvements

Closes 11/3/2026Opened 9/23/2026

Contra Costa Water District·California

72% match

City of Brentwood Water Treatment Plant Actuator and Control System Upgrades

Closes 11/10/2026Opened 10/1/2026

City of Rosenberg·Texas

72% match

Wastewater Treatment Plant Phase 2 - Collection System Rehabilitation

Closes 11/19/2026Opened 10/26/2026

City of Tuscaloosa Water & Sewer·Alabama

72% match

Bid - Hilliard N. Fletcher Water Resource Recovery Facility Phase III Improvements

Closes 12/8/2026Opened 9/28/2026

Texas City of Huntsville·Texas

72% match

NO. 27-06 NB Davidson WWTP

Closes 12/17/2026Opened 10/21/2026

City of High Point·North Carolina

72% match

Bid 4008-111826 Repair of Final Clarifier #3 Westside WWTP

Closes 11/18/2026Opened 10/15/2026

City of Evanston·Illinois

72% match

BID 26-49 Water Treatment Chemicals

Closes 11/3/2026Opened 10/8/2026

Central Unified School District·California

72% match

Bid2627-1 Pool Chemicals-Formal Bid Final(opens in new window)

Closes 11/16/2026Opened 10/28/2026

City of Hollywood·Florida

72% match

Water Treatment Plant Maintenance Package 'B'; Project No. 25-4262

Closes 12/3/2026Opened 10/26/2026