This opportunity calls for a comprehensive vessel‑voyage repair availability (VRA) on the U.S. Navy ship USS Mt Whitney (LCC‑20) while docked in Gaeta, Italy. The work includes hull and structural preservation, painting, steel repairs, auxiliary machinery maintenance, HVAC duct work, habitability outfitting, barometer calibration, and extensive hazardous‑waste handling (including asbestos removal). The contract is firm‑fixed‑price for listed Category A items, with Not‑Separately‑Priced (NSP) items covering gas‑free certification and hazardous‑material management. The performance window is a 15‑day period (1 Dec 2026 – 15 Dec 2026) within a broader one‑year availability, and all work must comply with Navy, ABS, USCG, OSHA, and EPA regulations.
• Scope covers painting ≈ 4,000 sq ft, steel repairs, pipe‑hang‑er asbestos removal, hydrostatic testing, and valve certifications.
• Contractor must provide daily gas‑free certificates, weekly hazardous‑waste reports, and submit detailed as‑built documentation.
• No price ceiling is disclosed; the contractor will submit a detailed cost breakdown (Attachment J‑1).
You found this one. Bid Banana has 1.6M+ bids and awards.
You found this bid by looking. Bid Banana searches open government bids across all 50 states, updated daily, so you stop hunting: save a search once and we email you your new matches, daily or weekly.