Bid Banana
PricingBid helpAPILog inStart free trial
Log inStart free trial

Learn more

  • California guideCalifornia Bids and Bidding Guide
  • Compliance checkHow to Ensure RFP Compliance
  • How to answer an RFPChoosing and Responding to Government Bids
More engineering services bids →Must-win bid? Bring in The Bid Lab →
Bid Banana
SearchPricingBid helpBrowse bidsAPISupportFAQPrivacy PolicyTerms of UseAI Use Policy

This website and its content is copyright of The Bid Lab © 2026. The Bid Lab is a trademark of Bid Lab, LLC. All rights reserved.

  1. Bid Banana
  2. ›Closed bids
  3. ›California
  4. ›Engineering Services
  5. ›Mendocino State Route 128 Flood and Feasibility Study

California Department of Transportation·California

Mendocino State Route 128 Flood and Feasibility Study

Closes 4/14/2026$400k – $500kRequest for Proposal
Bid source

This opportunity has closed.

Bid Banana tracks 1.6M+ bids and awards across all 50 states. Save a search and we'll email your new matches, daily or weekly — so the next one reaches you with time to bid.

Get alerted next time

Description

Caltrans is seeking a qualified consulting firm to perform a comprehensive flood‑risk and feasibility study for the 11.5‑mile stretch of State Route 128 in Mendocino County. The contractor will evaluate existing conditions, model future climate‑induced flooding scenarios, develop adaptation alternatives, engage stakeholders, and deliver a final feasibility report with preferred design concepts and cost estimates. The effort is organized into six tasks covering project management, technical assessment, advisory committee coordination, public outreach, alternative development, and final reporting. The contract is a fixed‑price, not‑to‑exceed $500,000 agreement lasting roughly 18 months, with work beginning after a Notice to Proceed (estimated June 30 2026). • Conduct hydrologic/hydraulic modeling (HEC‑RAS or equivalent) for SR 128 corridor (PM 0‑11.6) under baseline and sea‑level‑rise scenarios. • Produce GIS‑compatible maps, environmental impact assessments, and three ranked mitigation alternatives, including 30 % design concepts. • Facilitate a Technical Advisory Committee, quarterly stakeholder meetings, two public workshops, and a design workshop; prepare all associated reports and presentation materials. • Deliver monthly progress reports, a draft study, a comment‑response matrix, and a final study package before contract close (Dec 31 2027).

Attached files

Contact

Laurie Noble(Contract Analyst)

[email protected]

(279) 234-2411

Key dates

Opened
3/16/2026
Questions due
4/1/2026
Pre-bid meeting
3/25/2026
Closes
4/14/2026
Projected award
5/18/2026
Duration
18 months

Last updated

Details

Type
Request for Proposal
Industry
Engineering Services
NAICS
541330
Solicitation №
74A1772

Budget estimate

$400,000 – $500,000

The solicitation caps the total contract price at $500,000. Similar statewide transportation feasibility studies typically range from $350k‑$500k depending on scope depth and modeling complexity. Assuming a mid‑range effort, the award is likely to be between $400,000 and $500,000.

AI estimate from the solicitation

Similar opportunities

Matched by Bid Banana AI™

Bid Banana · 1.6M+ bids and awards 🍌

You found this one too late. Don't find the next one too late.

Bid Banana searches open government bids across all 50 states, updated daily. Save a search once and we email you your new matches, daily or weekly, while there is still time to win them.

1.6M+
bids & awards
All 50
states
4,000+
agencies
Start your 7-day free trial

Plans from $49.99/month. Cancel anytime, no setup fees.

Built by The Bid Lab, answering RFPs since 2017.

California Grants·California

Top match · 67%

Flood Partnership: Real-time Data Grant Program

Rolling / TBD closeOpened 8/21/2026

Federal Emergency Management Agency·Arkansas

66% match

Proposed Flood Hazard Determinations for the City of Jacksonville, Pulaski County, Arkansas

Rolling / TBD closeOpened 8/28/2026

California Grants·California

65% match

Dam Safety and Climate Resilience Local Assistance

Rolling / TBD closeOpened 5/19/2026

Manatee County - Purchasing Division·Florida

65% match

MUSGRAVE RANCH ROAD FLOODPLAIN COMPENSATION

Closes 11/20/2026Opened 10/15/2026

U.S. Department Of Defense·California

65% match

Coyote Valley Dam (CVD) Lake Mendocino Sewage and Septic Services

Closes 11/9/2026Opened 10/28/2026

U.S. Department of Homeland Security - FEMA·United States of America

65% match

Fiscal Year 2026 Flood Mitigation Assistance

Closes 2/26/2027Opened 10/22/2026

County of Santa Cruz·California

64% match

Eureka Canyon Road PM 8.11 and 8.39 Storm Damage Repair Projects

Closes 11/5/2026Opened 10/8/2026

County of Santa Cruz·California

64% match

Upper East Zayante PM 1.18 Storm Damage Repair Project

Closes 11/12/2026Opened 10/15/2026

Massachusetts Department of Agricultural Resources·Massachusetts

64% match

FY27 MDAR GRANT- Natural Disaster Recovery Grant II (NDR2)

Closes 11/16/2026Opened 8/3/2026

U.S. Department of Homeland Security - FEMA·United States of America

64% match

Fiscal Year 2024 Flood Mitigation Assistance

Rolling / TBD closeOpened 1/6/2025

Town of Bridgton·Maine

63% match

Request for Proposals - Willett Road Engineering Study

Closes 11/19/2026Opened 10/26/2026

County of Ontario·New York

63% match

Geneva Drinking Water Plant Floodplain Restoration Project Feasibility Study

Closes 12/15/2026Opened 10/15/2026

U.S. Economic Development Administration·United States of America

63% match

FY 2023 Disaster Supplemental

Rolling / TBD closeOpened 4/24/2023

City of Cedar Rapids·Iowa

63% match

8th Avenue Bridge Replacement and Floodwalls at Cedar River

Closes 11/4/2026Opened 8/26/2026

Town of Bridgton·Maine

63% match

RFPs Requested – Willett Road Engineering Study

Closes 11/19/2026Opened 10/20/2026

Delaware Valley Regional Planning Commission·Pennsylvania

63% match

Schuylkill River Pedestrian and Cyclist Bridge Feasibility Study (TCDI Project Category 5 – Transportation and Infrastructure Planning)

Closes 12/4/2026Opened 10/30/2026

U.S. DOC NOAA - ERA Production·United States of America

63% match

Advancing coastal flood protection through public-private partnerships, innovative insurance products, and improved sediment management.

Closes 2/12/2027Opened 9/25/2026

U.S. Department of Homeland Security - FEMA·United States of America

63% match

Fiscal Year 2024 Flood Mitigation Assistance Swift Current

Closes 12/30/2026Opened 5/30/2024

Massachusetts Department of Fish and Game·Massachusetts

63% match

Notice of Funding Opportunity - FY27 Transitional Crossing Site Selections

Closes 11/3/2026Opened 10/27/2026