The Confederated Tribes of the Colville Reservation’s Fish & Wildlife Department seeks a contractor to design, fabricate, and install a solar‑powered, full‑duplex PIT‑tag detection array at the mouth of the Sanpoil River, WA. The system must continuously monitor fish movements, be ruggedized for river conditions, and include training and documentation for Tribal staff. Delivery is split into two phases: design and build by February 28 2027, followed by installation, testing, and training by August 31 2027. The Tribe emphasizes Indian Preference (TERO) scoring, requires specific insurance and bonding, and expects detailed technical and cost proposals.
• Design and supply of dual‑antenna PIT‑tag detection hardware powered by solar panels with battery storage.
• Field installation, anchoring, environmental protection, testing, calibration, and on‑site staff training.
• Full documentation (wiring diagrams, operation manuals) and compliance with Tribal procurement rules (insurance, performance bond, TERO scoring).
You found this one too late. Don't find the next one too late.
Bid Banana searches open government bids across all 50 states, updated daily. Save a search once and we email you your new matches, daily or weekly, while there is still time to win them.