The opportunity is for a fire trainer liner replacement inside a structural trainer. The liner components must meet specific safety, thermal, and regulatory specifications, including being able to withstand 150 psi nozzle forces and having a 5-10 year warranty. The components should be made of a cementitious high temp composite formula with Kevlar additives and have a unique tongue and groove installation method. The project also involves various other tasks such as supplying and installing stainless steel continuous hinges, high temperature resistant door sweeps, and heat deflector shields.
• The liner components must comply with NFPA 1402 and related standards.
• The components should be able to withstand extreme live-fire training evolutions.
• The project involves inspecting, testing, and providing a full report on the structural training facility.
• The contractor must supply and install new equipment, such as WATLOW pyrometers and motor-operated modulating dampers.
• The contractor must also replace broken sprinkler mounts, rusted out doors, and corroded structural members.
You found this one too late. Don't find the next one too late.
Bid Banana searches open government bids across all 50 states, updated daily. Save a search once and we email you your new matches, daily or weekly, while there is still time to win them.