Bid Banana
PricingBid helpAPILog inStart free trial
Log inStart free trial

Learn more

  • Federal contracts (SAM.gov)The Ultimate Guide to SAM.gov Registration
  • Consulting Services RFPsConsulting Services Bids and Bidding Guide
  • How to answer an RFQRFQ Meaning: What Is an RFQ?
More consulting services bids →Must-win bid? Bring in The Bid Lab →
Bid Banana
SearchPricingBid helpBrowse bidsAPISupportFAQPrivacy PolicyTerms of UseAI Use Policy

This website and its content is copyright of The Bid Lab © 2026. The Bid Lab is a trademark of Bid Lab, LLC. All rights reserved.

  1. Bid Banana
  2. ›Closed bids
  3. ›Federal
  4. ›F--Phase I Environmental Site Assessment for GPRO

U.S. Department Of The Interior·California

F--Phase I Environmental Site Assessment for GPRO

Closes 9/8/2026$40k – $80kRequest for Quotation
Bid source

This opportunity has closed.

Bid Banana tracks 1.6M+ bids and awards across all 50 states. Save a search and we'll email your new matches, daily or weekly — so the next one reaches you with time to bid.

Get alerted next time

Description

The Bureau of Indian Affairs (BIA) Pacific is seeking quotations for Phase I Environmental Site Assessments (ESA) on eight parcels in the Great Plains region as part of a fee‑to‑trust land acquisition. The contractor must deliver individual ASTM E1527‑21‑compliant Phase I ESA reports for each parcel, include site reconnaissance, hazardous‑materials screening, and provide GIS shapefiles/KMZ files. BIA will coordinate site access and escort, but the contractor is responsible for locating landowners and completing any required questionnaires. The period of performance is one year (09/24/2026 – 09/30/2027) with a firm‑fixed‑price per CLIN. Invoicing may be done per line item upon acceptance of each report. • 8 distinct parcels (some with multiple parcels per CLIN) across ND/SD • Deliver individual Phase I ESA reports using ASTM E1527‑21 template • Provide GIS deliverables (shape/KMZ files) and hazardous‑materials screening (no asbestos/lead testing required) • BIA supplies existing aerials, legal descriptions, and will escort on‑site visits; contractor must identify landowner contacts • Firm‑fixed‑price per CLIN; invoices accepted per report • Submission deadline: 09/08/2026 5 pm PT; performance period: 09/24/2026‑09/30/2027

Attached files

Contact

Jodi Zachary

[email protected]

(916) 978-6005

Key dates

Opened
9/1/2026
Closes
9/8/2026
Duration
1 year

Last updated

Details

Type
Request for Quotation
Industry
Consulting Services
NAICS
541620
Solicitation №
140A0126Q0043

Budget estimate

$40,000 – $80,000

Based on typical Phase I ESA costs of $5,000–$10,000 per parcel for remote, multi‑site projects, the total contract value for eight sites is estimated between $40,000 and $80,000. Factors influencing the final amount include the complexity of each parcel (size, access issues), any additional GIS deliverables, and the firm‑fixed‑price pricing structure per CLIN.

AI estimate from the solicitation

Similar opportunities

Matched by Bid Banana AI™

Bid Banana · 1.6M+ bids and awards 🍌

You found this one too late. Don't find the next one too late.

Bid Banana searches open government bids across all 50 states, updated daily. Save a search once and we email you your new matches, daily or weekly, while there is still time to win them.

1.6M+
bids & awards
All 50
states
4,000+
agencies
Start your 7-day free trial

Plans from $49.99/month. Cancel anytime, no setup fees.

Built by The Bid Lab, answering RFPs since 2017.

U.S. Department Of Defense·Minnesota

Top match · 75%

Phase I Environmental Site Assessment at Lower Grey Cloud Slough Islands

Closes 11/11/2026Opened 10/29/2026

NYS Greenburgh, Town of·New York

69% match

Lead Service Lines Identification Project - Phase I

Closes 12/1/2026Opened 10/28/2026

City of Salisbury·Maryland

69% match

Park Water Treatment Plant PFAS Study 1

Closes 11/27/2026Opened 10/29/2026

U.S. Department Of Defense·California

68% match

Remedial Investigation (RI) and Optional Feasibility Study (FS) for Per- and Polyfluoroalkyl Substances (PFAS)

Closes 11/30/2026Opened 10/28/2026

County of Riverside·California

68% match

ENVIRONMENTAL SITE INVESTIGATION SERVICES

Closes 11/11/2026Opened 10/7/2026

NYS Rochester-Genesee Reg. Transportation Authority·New York

68% match

Environmental Consulting and Testing Services

Closes 12/4/2026Opened 10/30/2026

Massachusetts Northern Middlesex Council of Governments·Massachusetts

67% match

Northern Middlesex Brownfields Assessment Program Qualified Environmental Professional Services

Closes 11/20/2026Opened 10/23/2026

City of Seal Beach·California

66% match

San Gabriel River Trash Interceptor Pilot Project - Environmental Review / Permitting Support Services (CIP SD2501)

Closes 11/10/2026Opened 10/6/2026

Maryland Mayor and Town Council of Oakland·Maryland

66% match

PROFESSIONAL ENGINEERING SERVICES OAKLAND WATER SYSTEM COMPREHENSIVE ENGINEERING & INFRASTRUCTURE PLAN, PHASE I

Closes 11/9/2026Opened 10/9/2026

City of Sacramento·California

66% match

Parking Garage Structural Assessment

Closes 11/19/2026Opened 10/29/2026

Maryland City of Salisbury·Maryland

65% match

RFP 27-105 Park Water Treatment Plant PFAS Study 1

Closes 11/27/2026Opened 10/31/2026

State of Colorado Department of Local Affairs (Division of Housing)·Colorado

65% match

Ft Lyon Inspection, Lab Analysis & Testing

Closes 11/2/2026Opened 10/30/2026

City of Fairmont·West Virginia

65% match

FY27-09: BROWNFIELD COMMUNITY ASSESSMENT GRANT

Closes 12/3/2026Opened 10/28/2026

New York City Office of Technology and Innovation·New York

65% match

85827Y1399-Leveraging Ground-Scanning Technology to Build Understanding of Underground Infrastructure in New York City

Closes 11/16/2026Opened 9/14/2026

Wyoming State Construction Department·Wyoming

65% match

FY26 Community-Wide Brownfields Assessment - Dept of Environmental Quality

Closes 11/3/2026Opened 10/2/2026

Township of North Brunswick·New Jersey

65% match

Environmental Engineer

Closes 11/13/2026Opened 10/21/2026

U.S. Department Of The Interior·Arizona

65% match

Y--GRCA 257282 - Replace South Rim Wastewater Treatment Plant, Grand Canyon, AZ

Closes 11/2/2026Opened 7/20/2026

State of Colorado Department of Local Affairs·Colorado

65% match

Ft Lyon Inspection, Lab Analysis & Testing

Closes 11/2/2026Opened 10/14/2026

U.S. Geological Survey·United States of America

65% match

Cooperative Agreement for affiliated Partner with Northern Great Plains Cooperative Ecosystem Studies Unit

Closes 11/14/2026Opened 10/14/2026

City of Bellevue·Washington

65% match

Bellevue Airfield Park Geotechnical Engineering Services

Closes 11/19/2026Opened 10/29/2026

U.S. Department Of Defense·United States of America

65% match

Region 7 Southeast Mines Superfund Site

Closes 11/6/2026Opened 10/21/2026

Massachusetts Department of Fish and Game·Massachusetts

65% match

FWE-HAZMAT-19

Closes 12/2/2026Opened 11/29/2018

Grand River Dam Authority - GRDA·Oklahoma

65% match

Cooling Water System Performance Monitoring and Chemical Treatment Supply for GREC Units 2, 3 & 4

Closes 11/13/2026Opened 10/20/2026

The Metropolitan Water District of Southern California·California

65% match

Construction Manager/General Contractor Services for Direct Potable Reuse Demonstration Facility

Closes 11/12/2026Opened 9/4/2026

U.S. Department Of The Interior·Colorado

65% match

R--Geographic Information System (GIS) support, prepa

Closes 11/10/2026Opened 10/20/2026