The USS LEWIS B PULLER (ESB-3) MIDTERM AVAILABILITY (MTA) is a ship repair project that requires various services, including hull and structural repairs, electrical work, communication and navigation system maintenance, and habitability outfitting and furnishings. The project is expected to take place in the middle of calendar year 2027 and will be performed at a contractor shipyard in the Seventh Fleet Area of Responsibility (AOR).
• The project includes a wide range of tasks, such as replacing existing exterior stairwells, performing thermo graphic surveys, and inspecting and certifying machinery space and mission equipment deck cranes.
• The contractor will be required to provide a capability statement, which should include a brief description of the firm, shipyard location, and capabilities to perform a major ship repair overhaul.
• The government will only accept electronic submissions of interest and capability.
• The project is subject to change, and the government is not bound to award a contract based on this notice.
You found this one too late. Don't find the next one too late.
Bid Banana searches open government bids across all 50 states, updated daily. Save a search once and we email you your new matches, daily or weekly, while there is still time to win them.