Bid Banana
PricingBid helpAPILog inStart free trial
Log inStart free trial

Learn more

  • Pennsylvania guidePennsylvania Bids and Bidding Guide
  • Construction RFPsConstruction Bids and Bidding Guide
  • How to answer an IFBInvitation for Bid: You Just Received an IFB, Now What?
More construction bids →Must-win bid? Bring in The Bid Lab →
Bid Banana
SearchPricingBid helpBrowse bidsAPISupportFAQPrivacy PolicyTerms of UseAI Use Policy

This website and its content is copyright of The Bid Lab © 2026. The Bid Lab is a trademark of Bid Lab, LLC. All rights reserved.

  1. Bid Banana
  2. ›Closed bids
  3. ›Pennsylvania
  4. ›Construction
  5. ›Replace/Rebuild Blowers at Sewage Treatment Plant – Canoe…

Commonwealth of Pennsylvania - Department of Conservation and Natural Resources·Pennsylvania

Replace/Rebuild Blowers at Sewage Treatment Plant – Canoe Creek State Park

Closes 9/3/2026$250k – $600kInvitation for BidLogin required
Bid source

This opportunity has closed.

Bid Banana tracks 1.6M+ bids and awards across all 50 states. Save a search and we'll email your new matches, daily or weekly — so the next one reaches you with time to bid.

Get alerted next time

Description

The Commonwealth of Pennsylvania’s Department of Conservation and Natural Resources is seeking a qualified contractor to replace three Gardner‑Denver centrifugal blowers at the Canoe Creek State Park sewage treatment plant. The work includes demolition of existing equipment, supply and installation of three new blowers (identical or equivalent), start‑up testing, training, and delivery of operation‑maintenance manuals, all while maintaining uninterrupted plant operations and complying with environmental, safety, and prevailing‑wage requirements. • Scope: Remove existing 517‑AD centrifugal blowers, install three new identical or equivalent units, provide associated piping, valves, silencer, and controls. • Schedule: Work must start within 10 days of Notice to Proceed and be completed within 365 calendar days. • Requirements: Must hold 100 % performance and material/labor bonds, maintain required insurance, adhere to extensive environmental and safety statutes, and submit detailed shop drawings, product data, and operation‑maintenance manuals. • Financials: Engineer’s estimate ranges from $250,000 to $600,000; bids are evaluated on a lump‑sum basis. • Procurement: Bids submitted electronically via Bid Express; no pre‑bid meeting; site visit can be arranged by contacting the park manager at (814) 695‑6807.

Attached files

Contact

(814) 695-6807

Key dates

Opened
8/5/2026
Questions due
8/24/2026
Closes
9/3/2026
Projected award
8/6/2026
Duration
365 days

Last updated

Details

Type
Invitation for Bid
Industry
Construction
NAICS
238220
Solicitation №
FDC-318-10738.1

Budget estimate

$250,000 – $600,000

The solicitation’s engineer’s estimate lists a range of $250,000 to $600,000 for the full scope of demolition, supply, installation, testing, and documentation. Assuming a competitive bid close to the midpoint, the contractor could expect to earn roughly $400,000, but the final award could fall anywhere within the stated range depending on market pricing, bonding costs, and any change orders. Factors influencing the budget include the cost of the specific Gardner‑Denver blower model, travel and mobilization expenses to a rural park location, and compliance costs for prevailing‑wage, insurance, and environmental permits.

AI estimate from the solicitation

Similar opportunities

Matched by Bid Banana AI™

Bid Banana · 1.6M+ bids and awards 🍌

You found this one too late. Don't find the next one too late.

Bid Banana searches open government bids across all 50 states, updated daily. Save a search once and we email you your new matches, daily or weekly, while there is still time to win them.

1.6M+
bids & awards
All 50
states
4,000+
agencies
Start your 7-day free trial

Plans from $49.99/month. Cancel anytime, no setup fees.

Built by The Bid Lab, answering RFPs since 2017.

Commonwealth of Pennsylvania - Department of Conservation and Natural Resources·Pennsylvania

Top match · 75%

Rehabilitate Sewage Treatment Plant – Parker Dam State Park – Huston Township, Clearfield County, Pennsylvania

Closes 12/3/2026Opened 10/28/2026

U.S. Department Of The Interior·Colorado

72% match

Y--GRCA 257282 - Replace South Rim Wastewater Treatment Plant, Grand Canyon, AZ

Closes 11/2/2026Opened 6/26/2025

U.S. Department Of The Interior·Arizona

72% match

Y--GRCA 257282 - Replace Wastewater Plant at South Ri

Closes 11/18/2026Opened 10/16/2026

City of Charlotte·North Carolina

72% match

McDowell Creek Wastewater Treatment Plant Clarifier & Pumping Station

Rolling / TBD closeOpened 1/1/2027

Gwinnett County Government·Georgia

72% match

Patterson Pump Station Rehabilitation

Closes 12/8/2026Opened 10/21/2026

Dickenson County·Virginia

72% match

Dickenson County Public Service Authority Haysi Wastewater Treatment Plant

Closes 11/16/2026Opened 9/30/2026

Department of Buildings & General Services·Vermont

72% match

Mt. Ascutney State Park - South Wastewater System Improvements

Closes 11/13/2026Opened 10/21/2026

U.S. Department Of The Interior·Colorado

71% match

Y--GRCA 257282 - Replace Wastewater Plant at South Ri

Closes 11/2/2026Opened 7/31/2026

City of Charlotte·North Carolina

71% match

McAlpine Creek WRRF Digesters Rehabilitation

Rolling / TBD closeOpened 7/15/2027

Commonwealth of Pennsylvania - Department of Conservation and Natural Resources·Pennsylvania

71% match

Rehabilitate Sewage Treatment Plant – Parker Dam State Park (Electrical Contract)

Closes 12/3/2026Opened 10/28/2026

City of Douglas·Wyoming

71% match

Sanitary Sewer and Misc WWTP Improvements Project

Closes 11/3/2026Opened 10/16/2026

Town of Narragansett·Rhode Island

71% match

Stand-by Generator Replacement - Wastewater Treatment Plant

Closes 11/6/2026Opened 10/9/2026

Upper Occoquan Service Authority·Virginia

71% match

UOSA IFB 27-02 P2NR+ Construction

Closes 11/4/2026Opened 8/24/2026

Gwinnett County Government·Georgia

71% match

Patterson Pump Station Rehabilitation

Closes 12/8/2026Opened 10/21/2026

Johnson County Wastewater·Kansas

71% match

Notice - Progressive Design Build (PDB) Services for the Brush Creek Pump Station Improvements

Rolling / TBD closeOpened 11/4/2026

U.S. Department Of The Interior·Arizona

70% match

Y--GRCA 257282 - Replace South Rim Wastewater Treatment Plant, Grand Canyon, AZ

Closes 11/2/2026Opened 7/20/2026

Northern Virginia Parks·Virginia

70% match

Brambleton Golf Course - Replacement of Irrigation Pumping Plant

Closes 11/9/2026Opened 10/9/2026

Town of Jupiter·Florida

70% match

RO Plant Improvements & Membrane Replacements (W2010)

Closes 11/10/2026Opened 10/6/2026

Connecticut City of New Britain·Connecticut

70% match

27-009 Willow Brook Park Pool Filter Replacement

Closes 11/24/2026Opened 10/30/2026

City of Charlotte·North Carolina

70% match

Irwin Creek WWTP Stormwater Improvements Project

Rolling / TBD closeOpened 5/1/2026

Commonwealth of Pennsylvania - Department of Conservation and Natural Resources·Pennsylvania

70% match

Ryerson Station State Park – Park Improvements and Stream Corridor Restorations

Closes 11/12/2026Opened 10/14/2026

City of Charlotte·North Carolina

70% match

Gleneagles Storm Drainage Improvement Project

Rolling / TBD closeOpened 3/23/2026

New York City Department of Environmental Protection·New York

70% match

82626B0054-BEDC-PS-318 Reconstruction of Paerdegat Pumping Station

Closes 12/16/2026Opened 10/21/2026

City of St. Joseph·Missouri

70% match

Wastewater Treatment Boiler Rebuild

Closes 11/11/2026Opened 10/26/2026

Department of Buildings & General Services·Vermont

70% match

Kettle Pond State Park Drinking Water System

Closes 11/4/2026Opened 10/7/2026