Bid Banana
PricingBid helpAPILog inStart free trial
Log inStart free trial

Learn more

  • New York guideNew York Bids and Bidding Guide
  • Transportation RFPsTransportation and Public Transit Bids and Bidding Guide
More transportation and public transit bids →Must-win bid? Bring in The Bid Lab →
Bid Banana
SearchPricingBid helpBrowse bidsAPISupportFAQPrivacy PolicyTerms of UseAI Use Policy

This website and its content is copyright of The Bid Lab © 2026. The Bid Lab is a trademark of Bid Lab, LLC. All rights reserved.

  1. Bid Banana
  2. ›Closed bids
  3. ›New York
  4. ›Transportation and Public Transit
  5. ›R.F.E.I 05.22.26 - Continuous Welded Rail (CWR) Hauling…

NYS MTA - Long Island Rail Road·New York

R.F.E.I 05.22.26 - Continuous Welded Rail (CWR) Hauling Train

Closes 6/18/2026$5M – $20MRequest for Expression of InterestLogin required
Bid source

This opportunity has closed.

Bid Banana tracks 1.6M+ bids and awards across all 50 states. Save a search and we'll email your new matches, daily or weekly — so the next one reaches you with time to bid.

Get alerted next time

Description

SCOPE Prior to a formal solicitation to procure, the LIRR is seeking a Request For Expression of Interest from qualified manufacturers and suppliers regarding CWR Hauling Trains. Specifically: LIRR requires a complete rail hauling, delivery, and recovery train to facilitate rail delivery and pickup throughout the Long Island Rail Road (LIRR) System. The fully self-contained train and power unit shall be able to deliver and unload a minimum of 48 (EA.) 1440 feet (minimum) strings of CWR ranging from 100 PS to 136lb Rail. Operation of this equipment should be focused on efficiency and safety. One (1) each rail hauling train complete with pickup and delivery power unit. The train shall carry a minimum of 48 strings of Continuous Welded Rail (CWR) fourteen hundred and forty (1440) feet long (minimum). The train shall be configured for a minimum of eight (8) strings wide, and six (6) tiers high. The new rail train must be capable of being loaded from any stationary rail welding plant and have an interchange life of 50 years minimum. The new rail train shall be capable of BI - Directional loading and unloading operations. The rail train must be capable of safe travel at, minimally, thirty-five (35) MPH when loaded, and fifty-five (55) MPH when empty. The rail tied- down and equipment, shall provide adequate mechanical resistance, to fully retain all rail strings during transport, to all loading and unloading locations throughout the American and Canadian Railway Systems. This also applies to emergency braking. All cars and associated equipment shall be heavy-duty freight car manufactured to meet all AAR Standards and have interchange service life of 50 years. Design, construction, and materials used in the CWR train shall ensure that it will function reliably and efficiently in sustained operation under hard usage in an adverse railway environment, including, but not limited to, severe grades (3%), curves (24 degrees) and superelevation (8”). Firms who express an interest must address all points above in their proposal and may be invited to participate in meetings to discuss the matters addressed in this RFEI and may be requested to provide additional information. Information Submittal: Interested Firms should submit an Information Letter that includes the following: Letter of Introduction stating the name of the company and all contact information Description and brief history of Company (Include whether a small or large business, disadvantaged minority business, partnership, corporation, joint venture, etc.) Experience in this type of work References Your response to the RFEI will not be evaluated or ranked but will be used by the LIRR to possibly refine and improve the final specification and design. Submission Package Interested Firms should submit their Response with the header RFEI# 05.22.26 Continuous Welded Rail (CWR) Hauling Train electronically to: Daniel Sherwood via e-mail at [email protected] RFEI DUE DATE: 6/18/26 at 2:30PM.

Attached files

The solicitation documents live at the source — open the bid source above to download them.

Contact

Daniel Sherwood(Contract Administrator)

[email protected]

(718) 558-4934

Key dates

Opened
5/26/2026
Closes
6/18/2026

Last updated

Details

Type
Request for Expression of Interest
Industry
Transportation and Public Transit
NAICS
336510
Solicitation №
2135482

Budget estimate

$5,000,000 – $20,000,000

The budget for this opportunity is difficult to estimate as the document does not provide a specific budget or pricing information. However, based on the complexity and scope of the project, which involves the design, manufacture, and delivery of a custom rail hauling train, the budget could be substantial. A rough estimate could be in the range of $5 million to $20 million, considering the cost of materials, labor, and other expenses associated with such a project. Factors that may influence the likely payment range include the size and complexity of the train, the materials and technology used, and the manufacturer's experience and reputation.

AI estimate from the solicitation

Similar opportunities

Matched by Bid Banana AI™

Bid Banana · 1.6M+ bids and awards 🍌

You found this one too late. Don't find the next one too late.

Bid Banana searches open government bids across all 50 states, updated daily. Save a search once and we email you your new matches, daily or weekly, while there is still time to win them.

1.6M+
bids & awards
All 50
states
4,000+
agencies
Start your 7-day free trial

Plans from $49.99/month. Cancel anytime, no setup fees.

Built by The Bid Lab, answering RFPs since 2017.

NYS MTA - Long Island Rail Road·New York

Top match · 73%

Purchase of CW Rails (115RE & 136RE)

Closes 11/19/2026Opened 10/28/2026

Decatur Historical Commission and Depot Museum·Arkansas

67% match

F-7 Locomotive and Bay Window Caboose Restoration Project

Closes 12/31/2026Opened 10/4/2026

California Department of Corrections and Rehabilitation·California

66% match

C5613483-D, Welding Testing and Certification Services

Closes 11/3/2026Opened 10/12/2026

Inland Empire Utilities Agency·California

66% match

Finished Compost Transportation Services

Closes 11/19/2026Opened 10/12/2026

Virginia Department of Transportation·Virginia

66% match

B31_2027 STRUCTURE RECOATING OVER RAILROADS

Closes 11/18/2026Opened 10/14/2026

U.S. DOT - Federal Railroad Administration·United States of America

65% match

FY27 National Network Cooperative Agreement to the National Railroad Passenger Corporation

Closes 11/27/2026Opened 10/28/2026

South Carolina Rural Water Association (SCEMD Grant)·South Carolina

65% match

Crew Cab Pickup Truck

Closes 11/2/2026Opened 10/29/2026

State of Hawaii Department of Transportation·Hawaii

65% match

HWY-ORL-2026.01 VEGETATION MGMT. AND GENERAL RAILWAY MAINT. ROW

Closes 11/6/2026Opened 6/15/2026

Santa Clara Valley Transportation Authority·California

65% match

Guadalupe Light Rail Vehicle Wash Improvements

Closes 11/13/2026Opened 9/16/2026

U.S. Department Of Homeland Security·Maryland

65% match

HEAT WAGON

Closes 11/12/2026Opened 10/28/2026

South Coast Air Quality Management District·California

65% match

Cargo Handling Equipment, Locomotives, Ships at Berth Emissions Capture and Control Systems, and Transport Refrigeration Units Proposition 1B - Goods Movement Emission Reduction Program

Closes 11/20/2026Opened 9/8/2026

U.S. Department Of Defense·Alabama

65% match

FIRE CONTROL RADAR (FCR)

Closes 11/30/2026Opened 9/10/2026

Port of Lake Charles·Louisiana

65% match

Industrial Park East Rail Extension & Trans‑Loading Yard

Closes 11/19/2026Opened 10/13/2026

Virginia Railway Express·Virginia

64% match

IFB 027-004 Wheelset and Traction Motor Overhaul, Repair, and Rehabilitation Services

Closes 11/17/2026Opened 10/14/2026

Southern California Regional Rail Authority·California

64% match

Track Concrete Fastening OTM

Closes 12/1/2026Opened 10/19/2026

U.S. Department Of Defense·Pennsylvania

64% match

1355-01-620-4752 CWRT Wire Coil, Short

Closes 11/5/2026Opened 10/7/2026

Mississippi

64% match

Construction of Railroad Rehabilitation Phase 1

Closes 11/2/2026Opened 10/30/2026