The USCGC Penobscot Bay requires a contractor to perform a 5-year annual inspection of the Hi-Fog Water Mist Fire Suppression System. The contractor must be HI-FOG certified and must set up the water mist system for testing, complete the test, and place the system back in normal operation. The contractor must also ensure all connections, fittings, and equipment are operating correctly. The replacement parts to be included in the inspection are listed in the document.
• The contractor must use MPC R-A-13380, R-M-13373, R-C-14526 as guidance.
• The contractor must note and correct any discrepancies found during the inspection, but only if no additional cost is needed.
• The contractor must route any discrepancies that cause additional cost through the customer before correction.