Bid Banana
PricingBid helpAPILog inStart free trial
Log inStart free trial

Learn more

  • South Carolina guideSouth Carolina Bids and Bidding Guide
  • Construction RFPsConstruction Bids and Bidding Guide
  • How to answer an IFBInvitation for Bid: You Just Received an IFB, Now What?
More construction bids →Must-win bid? Bring in The Bid Lab →
Bid Banana
SearchPricingBid helpBrowse bidsAPISupportFAQPrivacy PolicyTerms of UseAI Use Policy

This website and its content is copyright of The Bid Lab © 2026. The Bid Lab is a trademark of Bid Lab, LLC. All rights reserved.

  1. Bid Banana
  2. ›Closed bids
  3. ›South Carolina
  4. ›Construction
  5. ›Pump Station 10 Force Main Replacement Project

County of Dorchester, SC·South Carolina

Pump Station 10 Force Main Replacement Project

Closes 5/15/2026$1.5M – $3MInvitation for Bid
Bid source

This opportunity has closed.

Bid Banana tracks 1.6M+ bids and awards across all 50 states. Save a search and we'll email your new matches, daily or weekly — so the next one reaches you with time to bid.

Get alerted next time

Description

The Pump Station 10 Force Main Replacement Project involves the replacement of an existing 8-inch sewer force main with a new 10-inch sewer force main. The project includes the installation of approximately 9,900 linear feet of 10-inch sewer force main, including 1,900 linear feet of 10-inch DR18 PVC pipe installed via open-cut methods and 7,700 linear feet of 10-inch fusible PVC installed via horizontal directional drilling. The project also includes the installation of plug valves, air release valves, and other appurtenances. The successful bidder will be required to provide all labor, materials, and equipment necessary to complete the project. The project is expected to be completed within 150 calendar days from the date of issuance of the Notice to Proceed. Key aspects of the project include: • Installation of 9,900 linear feet of 10-inch sewer force main • Installation of 1,900 linear feet of 10-inch DR18 PVC pipe via open-cut methods • Installation of 7,700 linear feet of 10-inch fusible PVC via horizontal directional drilling • Installation of plug valves, air release valves, and other appurtenances • Completion of the project within 150 calendar days from the date of issuance of the Notice to Proceed

Attached files

The solicitation documents live at the source — open the bid source above to download them.

Contact

Carl Ragos(Purchasing Services Manager)

[email protected]

(843) 414-9773

Key dates

Opened
4/14/2026
Questions due
5/4/2026
Pre-bid meeting
4/28/2026Mandatory
Closes
5/15/2026
Duration
150 days

Last updated

Details

Type
Invitation for Bid
Industry
Construction
NAICS
237110
Solicitation №
2026-54

Budget estimate

$1,500,000 – $3,000,000

The budget for this project can be estimated based on the scope of work and industry standards. The installation of 9,900 linear feet of 10-inch sewer force main, including materials and labor, could cost between $1.5 million to $3 million. This estimate is based on average costs per linear foot of sewer main installation, which can range from $150 to $300 per linear foot. Additional costs for appurtenances, testing, and other requirements could add to the overall project cost. Therefore, a reasonable budget estimate for this project is between $1.5 million and $3 million.

AI estimate from the solicitation

Similar opportunities

Matched by Bid Banana AI™

Bid Banana · 1.6M+ bids and awards 🍌

You found this one too late. Don't find the next one too late.

Bid Banana searches open government bids across all 50 states, updated daily. Save a search once and we email you your new matches, daily or weekly, while there is still time to win them.

1.6M+
bids & awards
All 50
states
4,000+
agencies
Start your 7-day free trial

Plans from $49.99/month. Cancel anytime, no setup fees.

Built by The Bid Lab, answering RFPs since 2017.

City of Tampa, Florida·Florida

Top match · 74%

26-C-00018 Gunlock Pump Station Force Main Replacement

Closes 11/17/2026Opened 10/16/2026

Jea·Florida

69% match

1412232281 (IFB) Carlotta Road Pump Station Upgrade

Closes 12/1/2026Opened 10/28/2026

City of Tampa, Florida·Florida

69% match

RFQ 27-D-00003 43rd St. Pump Station Force Main Replacement Design

Closes 12/3/2026Opened 10/30/2026

Connecticut Town of South Windsor·Connecticut

69% match

Clark Street Pump Station Main Replacement Project

Closes 11/4/2026Opened 10/6/2026

City of Branson·Missouri

68% match

RFB 2900-16 Annual Lift Station Pump Rebuilds Replacements 2027

Closes 11/20/2026Opened 10/20/2026

City of San Diego·California

67% match

Pump Station 2 Improvements and Modernization (Advertisement Only : No BIDS)

Closes 12/10/2026Opened 10/28/2026

Gwinnett County Government·Georgia

67% match

Patterson Pump Station Rehabilitation

Closes 12/8/2026Opened 10/21/2026

City of DeLand·Florida

67% match

Lift Station #10 Relocation

Closes 11/18/2026Opened 10/13/2026

Town of Blacksburg·Virginia

67% match

IFB 1231-26 Northside Park Pump Station Force Main Relocation

Closes 11/17/2026Opened 10/16/2026

City of Camden·South Carolina

67% match

Cool Springs Pump Station Replacement

Closes 11/18/2026Opened 10/19/2026

Manatee County - Purchasing Division·Florida

66% match

LIFT STATION 9-A FORCE MAIN EXTENSION

Closes 11/20/2026Opened 10/9/2026

Gwinnett County Government·Georgia

66% match

Beaver Ruin Diversion Pump Station Grinders Replacements Project

Closes 11/20/2026Opened 10/7/2026

Jea·Florida

66% match

1412230880 (IFB) Construction Services for the Cleveland Road - Force Main Crossings

Closes 12/8/2026Opened 10/28/2026

Upper Occoquan Service Authority·Virginia

66% match

UOSA IFB 27-02 P2NR+ Construction

Closes 11/4/2026Opened 8/24/2026

Miami‑Dade County Water & Sewer Department·Florida

66% match

Pump Station 0812 Relocation and Upgrade

Closes 12/1/2026Opened 10/16/2026

City of Waynesboro·Virginia

65% match

Shenandoah Village Drive Pump Station Replacement and System Improvements Contract I

Closes 11/10/2026Opened 9/30/2026

City of St. Michael·Minnesota

65% match

39th Street Lift Station & Forcemain Decommission Project

Closes 11/3/2026Opened 10/16/2026

Georgia Emanuel County Board of Education·Georgia

65% match

Swainsboro High School Concession Stand Pump Station Upgrade

Closes 11/13/2026Opened 10/30/2026

City of Frazee, MN·Minnesota

65% match

2026 Sanitary Lift Station Improvements - Main Ave E & 2nd Street SW

Closes 11/18/2026Opened 10/16/2026

Hampton Roads Sanitation District·Virginia

64% match

Solicitation No. 408367: Magruder Mercury Interceptor Force Main Replacement – Section B (YR010520/VCWRLF)

Closes 11/10/2026Opened 10/1/2026

Gwinnett County Government·Georgia

64% match

Beaver Ruin Diversion Pump Station Grinders Replacements Project

Closes 11/20/2026Opened 10/7/2026

Gwinnett County Government·Georgia

64% match

Patterson Pump Station Rehabilitation

Closes 12/8/2026Opened 10/21/2026

U.S. Department Of Defense·United States of America

64% match

43--PUMP UNIT,CENTRIFUG, IN REPAIR/MODIFICATION OF

Closes 11/27/2026Opened 10/28/2026

Jackson County Utility Authority·Mississippi

64% match

Pump Station #20 Rehab

Closes 11/17/2026Opened 9/20/2026

City of Coronado·California

64% match

First Street Stormwater Pump Station Flood Relief Project

Closes 11/9/2026Opened 9/23/2026