The Village of Gurnee is contracting the removal, soil remediation, and replacement of its underground storage tank (UST) system at the Public Works Facility, including demolition of existing fuel island structures, installation of new double‑wall FRP gasoline and diesel tanks, construction of a new concrete fuel island and canopy, and associated fuel‑management, dispenser, lighting, and security systems. The scope also now requires the contractor to install shielded CAT‑6A cabling, an 8‑port patch panel, conduit routing, and a Wi‑Fi router as detailed in Addendum #1.
• Remove existing 8,000‑gal gasoline and 6,000‑gal diesel USTs, associated piping, canopy, and contaminated soils (≈ 660 tons total).
• Install new 12,000‑gal gasoline and 8,000‑gal diesel double‑wall FRP USTs with leak‑detection, new concrete fuel island, raised canopy, and a Syntech fuel‑management system.
• Provide civil works (concrete slabs, curb & gutter, steel guard posts, footings) and complete electrical, lighting, and security camera installations, plus structured‑cable work per Addendum #1.
• Full compliance with OSFM, IEPA, prevailing‑wage, and safety regulations; final completion expected mid‑May 2027.