The Prosser Creek Dam Basin Cleanup project involves the removal of accumulated materials from the spillway stilling basin, including fine sediments, gravels, cobbles, boulders, chain-link fencing material, and large woody debris. The contractor will also remove debris and sediment from the two 6-inch drains located in the identified chute blocks and perform a detailed inspection of the concrete floor and all spillway stilling basin features following material removal. The project requires a firm-fixed price construction contract and will be awarded to the responsible offeror submitting the lowest evaluated price of proposals meeting or exceeding the acceptability standards for non-cost/price factors.
• The project is located at Prosser Creek Dam, California.
• The project involves the removal of approximately 55 cubic yards of sediment and 10 cubic yards of boulders and other debris.
• The contractor will be required to complete the work within 364 days from the issuance of the Notice to Proceed.
• The contractor will be required to provide a detailed technical proposal, including a description of the technical approach, construction schedule and sequencing, and experience.
• The contractor will be required to provide a price proposal, including a breakdown of the proposed prices for each contract line item.