The US Air Force is seeking a contractor to repair the Aircraft Fire Trainer Facility and the Structural Fire Training Facility. The contractor will be responsible for providing all management, labor, equipment, transportation, tools, materials, and other items necessary to complete the repairs. The scope of work includes repairing bar grating and welding plate bridges, repairing lower weir drain valves, installing French drains, and rehabilitating floors. The contractor must comply with all applicable laws and regulations, including those related to security and access to Air Force installations.
• Repair 100 linear feet of bar grating and welding plate bridge on the rescue and off rescue side of the fuselage.
• Repair the lower weir drain valve and install a 20’ French drain.
• Repair the cracked steel plate through welding at the passenger training point.
• Remove and replace the shipboard ladder to the control tower access and replace with galvanized stair assembly from the sidewalk to the tower.
• Repair cracked inboard and outbound engine spires.
• Repair and replace broken/cracked Maranite burn cell liner in burn cell 1 and 2.
• Rehabilitate the floors on the roof, 3rd and 2nd levels.
• Install fall protection chain in both the attic windows to prevent firefighter injury.
• Repair the roof opening at repelling points with a stainless chain and locking carabiners.
You found this one too late. Don't find the next one too late.
Bid Banana searches open government bids across all 50 states, updated daily. Save a search once and we email you your new matches, daily or weekly, while there is still time to win them.