Bid Banana
PricingBid helpAPILog inStart free trial
Log inStart free trial

Learn more

  • Federal contracts (SAM.gov)The Ultimate Guide to SAM.gov Registration
  • Construction RFPsConstruction Bids and Bidding Guide
  • How to answer an RFPChoosing and Responding to Government Bids
More construction bids →Must-win bid? Bring in The Bid Lab →
Bid Banana
SearchPricingBid helpBrowse bidsAPISupportFAQPrivacy PolicyTerms of UseAI Use Policy

This website and its content is copyright of The Bid Lab © 2026. The Bid Lab is a trademark of Bid Lab, LLC. All rights reserved.

  1. Bid Banana
  2. ›Closed bids
  3. ›Federal
  4. ›B695 Tank Farm Revitalization-Design-Build

U.S. Department Of Energy·California

B695 Tank Farm Revitalization-Design-Build

Closes 6/15/2026$5M – $20MRequest for Proposal
Bid source

This opportunity has closed.

Bid Banana tracks 1.6M+ bids and awards across all 50 states. Save a search and we'll email your new matches, daily or weekly — so the next one reaches you with time to bid.

Get alerted next time

Description

The B695 Tank Farm Revitalization project aims to upgrade the wastewater treatment system at Lawrence Livermore National Laboratory. The project includes the design, demolition, and installation of five chemical reagent dosing systems, the removal and replacement of nine tank mixer assemblies, and the design and installation of nine coarse bubble diffusers. The goal is to improve operational efficiency, enhance safety, and ensure continued compliance with regulatory requirements. The project has a base scope and an optional scope, which includes the installation of new instrumentation. Key aspects of the project include: • Reagent dosing system: a centralized system to dose 5 different reagents into nine 5,000-gallon treatment tanks • Tank mixers: replacement of nine tank mixer assemblies with new ones capable of thoroughly mixing the 5,000-gallon tank in 10 minutes • Coarse bubble diffusers: installation of nine diffusers to aerate the liquid with 60 scfm per tank • Optional instrumentation: installation of new instrumentation, including pH/ORP, conductivity, oxygen, TSS, and liquid level sensors on each tank

Attached files

The solicitation documents live at the source — open the bid source above to download them.

Contact

Gary Arruda

[email protected]

Key dates

Opened
6/1/2026
Closes
6/15/2026

Last updated

Details

Type
Request for Proposal
Industry
Construction
NAICS
238220
Solicitation №
B673616

Budget estimate

$5,000,000 – $20,000,000

The budget for this project can be estimated based on the scope of work, which includes design, demolition, and installation of various systems. The cost of such a project can range from a few million dollars to tens of millions of dollars, depending on the complexity of the design, the materials used, and the labor costs. Assuming a moderate level of complexity and using industry benchmarks, a rough estimate for the project could be between $5 million and $20 million. Factors that may influence the likely payment range include the experience and qualifications of the contractor, the availability of materials and labor, and the regulatory requirements that must be met.

AI estimate from the solicitation

Similar opportunities

Matched by Bid Banana AI™

Bid Banana · 1.6M+ bids and awards 🍌

You found this one too late. Don't find the next one too late.

Bid Banana searches open government bids across all 50 states, updated daily. Save a search once and we email you your new matches, daily or weekly, while there is still time to win them.

1.6M+
bids & awards
All 50
states
4,000+
agencies
Start your 7-day free trial

Plans from $49.99/month. Cancel anytime, no setup fees.

Built by The Bid Lab, answering RFPs since 2017.

City of Holly Grove·Arkansas

Top match · 71%

City of Holly Grove Water System Improvements – Water Tank Rehabilitation and Plant Building Modification

Closes 11/18/2026Opened 10/25/2026

Eden Prairie Schools·Minnesota

71% match

Transportation Building Fuel Tanks Replacement

Closes 11/24/2026Opened 10/29/2026

Washington Enterprise Services (DES), Dept. of·Washington

71% match

WSP - FTA Fuel Farm Refurbishment

Closes 11/18/2026Opened 10/22/2026

New York City Department of Design and Construction·New York

70% match

85027P0001-PW348-91,-94_RC for CM/Design/Build for Petroleum Storage Tank Sumps, Citywide

Closes 12/3/2026Opened 10/19/2026

U.S. Department Of Defense·U.S. Armed Forces – Pacific

70% match

DESC2103C - Bulk Fuel Storage Tanks Phase II, Yokota Air Base, Japan

Closes 1/24/2027Opened 7/14/2026

U.P. Engineers & Architects, Inc·Michigan

70% match

Adams Township Water Tank

Closes 11/24/2026Opened 10/30/2026

U.S. Department Of Defense·Kentucky

69% match

Fishtrap Lake Intake Structure and Dam Rehabilitation; W91237-26-R-A020

Closes 11/6/2026Opened 10/9/2026

City of Green Cove Springs·Florida

69% match

DEP SRF Harbor Road WRF Expansion, Phase 3 - Reclaimed Water Ground Storage Tank

Closes 12/3/2026Opened 10/26/2026

City of Rosenberg·Texas

69% match

Water Plant No 4 - Recoat Elevated Storage Tank

Closes 11/19/2026Opened 10/26/2026

Laramie Rivers Conservation District·Wyoming

68% match

Laramie River - Hart Ranch Restoration

Closes 11/8/2026Opened 8/27/2026

Massachusetts Town of Hopkinton·Massachusetts

68% match

GROVE STREET TANK REHABILIATION

Closes 11/18/2026Opened 10/28/2026

U.S. Department Of Defense·United States of America

68% match

DESC2103C - Bulk Fuel Storage Tanks Phase II, Yokota Air Base, Japan

Closes 1/24/2027Opened 9/25/2026

Town of Camp Verde·Arizona

68% match

RFQ for Verde Commercial Tanks and Pump Station Project

Closes 11/23/2026Opened 10/19/2026

Commonwealth of Pennsylvania - Department of Conservation and Natural Resources·Pennsylvania

68% match

Rehabilitate Sewage Treatment Plant – Parker Dam State Park – Huston Township, Clearfield County, Pennsylvania

Closes 12/3/2026Opened 10/28/2026

U.S. Department Of Defense·Nebraska

67% match

API 653 Fuel Tank Repairs and Maintenance - Eielson AFB, Alaska

Closes 8/3/2027Opened 8/3/2026

City of Hanska·Minnesota

67% match

Hanska City 100,000‑Gallon Elevated Water Storage Tank Construction

Closes 11/23/2026Opened 10/23/2026

Northern Virginia Parks·Virginia

67% match

Brambleton Golf Course - Replacement of Irrigation Pumping Plant

Closes 11/9/2026Opened 10/9/2026

New York City Department of Environmental Protection·New York

67% match

82627B0022-BEDC-NR-107 Structural improvements to the North River WRRF

Closes 12/9/2026Opened 10/22/2026